<?xml version="1.0"?><!-- generator="bbPress" -->

<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
>

<channel>
<title>DavidCadogan.ca Forums Topic: J860udlL4J</title>
<link>http://davidcadogan.ca/bbpress/</link>
<description>DavidCadogan.ca Forums Topic: J860udlL4J</description>
<language>en</language>
<pubDate>Sat, 13 Jun 2026 22:34:25 +0000</pubDate>

<item>
<title>vf1fS9Ab7Sa on "J860udlL4J"</title>
<link>http://davidcadogan.ca/bbpress/topic.php?id=359920&#038;page#post-387552</link>
<pubDate>Sat, 19 Dec 2015 17:12:42 +0000</pubDate>
<dc:creator>vf1fS9Ab7Sa</dc:creator>
<guid isPermaLink="false">387552@http://davidcadogan.ca/bbpress/</guid>
<description>&lt;p&gt;&amp;lt;br&amp;gt;The Beijing News (Reporter Zhang Yuan) due to the production of concrete failed,&lt;a href=&quot;http://pogalgraph.px2.jp/cgi-bin/diary/diary.cgi&quot;&gt;Wo356t1g1q&lt;/a&gt;, resulting in six new fitness room was dismantled, Beijing Hua jump off concrete limited liability company (hereinafter referred to  Division) and its manager Wang Guodong, was the prosecution's allegations.&amp;lt;br&amp;gt; &amp;lt;br&amp;gt;A briefing yesterday in the hospital to make the production and sale of fake or substandard products and sentenced to a fine of 200,000 of the concrete company, company managers jailed for three and a half concurrence 200,000.&amp;lt;br&amp;gt; &amp;lt;br&amp;gt;&quot;Rubbish&quot; because of substandard concrete&amp;lt;br&amp;gt; &amp;lt;br&amp;gt;In August 2010, authorities in Daxing District housing project supervision and inspection found the Palazzo Vecchio triangle B, question the strength of concrete test block design does not meet the requirements of the emergence of C zone eight residential projects, after the Municipal Construction Committee and Daxing District live Construction embarked on a full investigation, the matter after the media called &quot;Ming Yue Wan rubbish&quot; event.&amp;lt;br&amp;gt; &amp;lt;br&amp;gt;In October, six have been completed involving the demolition of all buildings, this is the first place in Beijing.&amp;lt;br&amp;gt; &amp;lt;br&amp;gt;August 2011, Daxing District Prosecutor's Office for concrete supply units and their managers Hua Yuegong Secretary Wang Guodong while allegations. Prosecutors believe that the company provided to the existence of the ratio does not match the ratio of the construction unit, reducing the amount of cement concrete acts performed in the production, resulting in the supply of ready-mixed concrete compressive strength failed.&amp;lt;br&amp;gt; &amp;lt;br&amp;gt;Said ratio to meet the requirements of suppliers&amp;lt;br&amp;gt; &amp;lt;br&amp;gt;In the hearing, the Secretary stressed  ratio provided comply with the relevant provisions of the State. Wang Guodong also said that the production of concrete from the factory to the construction site is dynamic, after inspection and supervision of the construction side side delivery, delivery procedures.&amp;lt;br&amp;gt; &amp;lt;br&amp;gt;This project production managers said when they found the first batch of concrete problems, this has also sent a 11 consecutive official letter. Report Municipal Construction Committee issued believes that China jump off the concrete mix to the construction unit and the ratio does not match the magnesium cement content,&lt;a href=&quot;http://zylswh.com/bbs/home.php?mod=space&amp;#38;uid=72434&quot;&gt;&lt;/a&gt;, chloride ion content, three days compressive strength, fineness of fly ash does not meet the Claim. Hua jump off six buildings Construction Supply Concrete serious physical strength concrete does not meet the design requirements.&amp;lt;br&amp;gt; &amp;lt;br&amp;gt;Court of First Instance that the defendant and the defendant had constituted units production,&lt;a href=&quot;http://www.ritex.it/temp.php&quot;&gt;piumini moncler&lt;/a&gt;, marketing fake or substandard products, then made the decision. Recently, a Court of Final Appeal rejected the appeal and upheld the conviction.&amp;lt;br&amp;gt; &amp;lt;br&amp;gt;■ case&amp;lt;br&amp;gt; &amp;lt;br&amp;gt;To control costs to reduce the amount of cement&amp;lt;br&amp;gt; &amp;lt;br&amp;gt;According to the person in charge of production  Division confirmed the initial contract offer to the construction site,&lt;a href=&quot;http://211.86.128.2/gjjl/Review.asp?NewsID=595&quot;&gt;X63ETwvrgq&lt;/a&gt;, C25, C30, C35 three levels of ready-mixed concrete, concrete C30 contract is 248 yuan per cubic meter, the difference between a poor grade 12 dollars,&lt;a href=&quot;http://bbs.bc9999.net/home.php?mod=space&amp;#38;uid=8856&quot;&gt;&lt;/a&gt;, and C30 prevailing market price is about 265 yuan per cubic meter.&amp;lt;br&amp;gt; &amp;lt;br&amp;gt;&quot;Because less consumption items near the road and the vehicle,&lt;a href=&quot;http://ximashi.com.cn/news/html/?27103.html&quot;&gt;lGXHv1Jrm7&lt;/a&gt;, after this calculation,&lt;a href=&quot;http://www.panna-project.eu/partners/chemstream.html&quot;&gt;nike air max 90&lt;/a&gt;, but also has a few dollars per cubic meter of profits, and good government projects the back section.&quot; So the company took over this single business, but really want When started,&lt;a href=&quot;http://www.credac.fr/v2/&quot;&gt;tn reuqin pas cher&lt;/a&gt;, found that if the ratio in accordance with the requirements of the construction side, not only does not profit, but also lose money,&lt;a href=&quot;http://www.panna-project.eu/partners/chemstream.html&quot;&gt;air max 90 pas cher&lt;/a&gt;, so he proportion by the technical department a little experiment can start earning money.&amp;lt;br&amp;gt; &amp;lt;br&amp;gt;Ultimately,&lt;a href=&quot;http://www.postyourblowjob.com&quot;&gt;4vLQv177sl&lt;/a&gt;, each group of three,&lt;a href=&quot;http://www.ritex.it/temp.php&quot;&gt;moncler outlet italia&lt;/a&gt;,&lt;a href=&quot;http://tanukitam.seesaa.net&quot;&gt;luhPcM12lJ&lt;/a&gt;, were done for three days, after seven days and twenty-eight days compressive report, they touched the &quot;tricks.&quot;&amp;lt;br&amp;gt; &amp;lt;br&amp;gt;Wang Guodong had to answer questions when the ratio, said: &quot;In order to control costs, the ratio of raw materials secretly changed, to put some more expensive material,&lt;a href=&quot;http://strawberry.kuronowish.com/cgi-bin/tree/apeboard_plus.cgi?command=read_message&amp;amp;msgnum=10/&quot;&gt;vLieN7J6Ah&lt;/a&gt;, put some less expensive.&quot; Cause the actual proportions of cement per cubic meter of concrete less 110 kilograms, 30 kilograms of fly ash raised, but also added 90 kg of slag.&amp;lt;br&amp;gt; &amp;lt;br&amp;gt;August 2010, due to the strength of concrete test block does not meet the design requirements, Daxing Jiugong exposed &quot;Ming Yue Wan rubbish&quot; incident, six newly built fitness room, and finally had to be demolished.&amp;lt;br&amp;gt; &amp;lt;br&amp;gt;Authorities in the investigation found that the incident originated concrete supplier  Division in the production of concrete in order to save costs, secretly altered material ratio, resulting in concrete failed.&amp;lt;br&amp;gt; &amp;lt;br&amp;gt;(Original title: manager jailed for production of substandard concrete)&amp;lt;br&amp;gt; (Edit: SN056)&amp;lt;br&amp;gt;
&lt;/p&gt;</description>
</item>

</channel>
</rss>
