<?xml version="1.0"?><!-- generator="bbPress" -->

<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
>

<channel>
<title>DavidCadogan.ca Forums Topic: and because little available land</title>
<link>http://davidcadogan.ca/bbpress/</link>
<description>DavidCadogan.ca Forums Topic: and because little available land</description>
<language>en</language>
<pubDate>Tue, 27 Oct 2026 04:13:40 +0000</pubDate>

<item>
<title>dslfkoiu2t4 on "and because little available land"</title>
<link>http://davidcadogan.ca/bbpress/topic.php?id=369748&#038;page#post-397477</link>
<pubDate>Mon, 04 Jan 2016 17:20:22 +0000</pubDate>
<dc:creator>dslfkoiu2t4</dc:creator>
<guid isPermaLink="false">397477@http://davidcadogan.ca/bbpress/</guid>
<description>&lt;p&gt;Villagers Linde Xiao took his family's rural collective land contract warrants to reporters,&lt;a href=&quot;http://www.orangesite.it/temp.php&quot;&gt;moncler outlet italia&lt;/a&gt;, the contract period has not expired. Behind him, it is housed in a building built fast.&amp;lt;br&amp;gt;&amp;lt;br&amp;gt;No compensation, nor recover the land contract certificate,&lt;a href=&quot;http://www.panna-project.eu/partners/chemstream.html&quot;&gt;nike air max 90&lt;/a&gt;, Sanmen County, Taizhou, Zhejiang Linde Xiao farmers planted rice a decade of agricultural land, and now others have been built a four-storey building.&amp;lt;br&amp;gt;&amp;lt;br&amp;gt;&amp;lt;br&amp;gt;&quot;According to the law,&lt;a href=&quot;http://www.sddistribution.fr/contacts.php&quot;&gt;nike tn pas cher&lt;/a&gt;, the right to contract agricultural land into construction land needs to be recycled and to build a house, but the relevant personnel and departments have no prior consultation with our contractor on occupied!&quot; Linde Xiao said, where he spent Town Temple village, many villagers have encountered such problems.&amp;lt;br&amp;gt;&amp;lt;br&amp;gt;&amp;lt;br&amp;gt;Reporters recently conducted a survey interview came to the local. Flower Town officials said the town planning and general land approval procedures no problem, the problem of land in the village did not coordinate the work with the villagers. Reporters &amp;amp; nbsp; Chenshan Jun &amp;amp; nbsp; text / photo&amp;lt;br&amp;gt;&amp;lt;br&amp;gt;&amp;lt;br&amp;gt;Great views of the villagers&amp;lt;br&amp;gt;&amp;lt;br&amp;gt;&amp;lt;br&amp;gt;Card in the hands of contractors, agricultural land was covered with a room&amp;lt;br&amp;gt;&amp;lt;br&amp;gt;&amp;lt;br&amp;gt;Sanmen Flower Town Village Temple  with a reporter came to the village, through a golden paddy fields, he pointed to the scaffolding draped four-story building built in a fast, &quot;said the contractor, this is my home ground!&quot;&amp;lt;br&amp;gt;&amp;lt;br&amp;gt;&amp;lt;br&amp;gt;Linde Xiao took out his &quot;Zhejiang rural collective land contract warrants&quot; to reporters, stated on warrants household name, location and size of contracted land plots and other information, &quot;the farmers of this syndrome cases are a 30-year land contract rights , start and end dates for the September 30, 1999 to September 30, 2029 &quot;warrants covered with&quot; three county people's government,&lt;a href=&quot;http://store.shopping.yahoo.co.jp/mamapan/21110208.html&quot;&gt;http://store.shopping.yahoo.co.jp/mamapan/21110208.html&lt;/a&gt;, &quot;the official seal.&amp;lt;br&amp;gt;&amp;lt;br&amp;gt;&amp;lt;br&amp;gt;&quot;If the contractor can easily occupy land, then sent to the county government, what our contract permits the use?&quot;  say they contracted the land has more than ten years, until his father in rice . In the first half of this year they had just finished harvesting the rice, ready to continue planting, construction vehicles came in to fill the pond residue field. The original piece of land has been given to the other villagers, for building up.&amp;lt;br&amp;gt;&amp;lt;br&amp;gt;&amp;lt;br&amp;gt;Villagers told reporters reflect, in the village, still in the hands of the land contract certificate was the case more than  home building example, there is a twenty villagers contracted land are occupied housing. The villagers took out a bunch of land contract warrants, on the table to reporters.&amp;lt;br&amp;gt;&amp;lt;br&amp;gt;&amp;lt;br&amp;gt;&quot;It involved approximately twelve ten acres of agricultural land have been built in the house.&quot; The villagers forests that first began in 2012, when the slag pond filling, began to focus on this year officially started.&amp;lt;br&amp;gt;&amp;lt;br&amp;gt;&amp;lt;br&amp;gt;No prior consultation nor compensation, unreasonable&amp;lt;br&amp;gt;&amp;lt;br&amp;gt;&amp;lt;br&amp;gt;It is understood that the land is used for placement of the old village of old evicted, although the house was built by the head of the household own contribution, but the land is divided by the town unified index down, and according to a unified plan housing.&amp;lt;br&amp;gt;&amp;lt;br&amp;gt;&amp;lt;br&amp;gt;As early as seven or eight years old and old houses before the town on the planning of resettlement, resettlement Lot Temple village there are some on the election in the road near the farm ground.&amp;lt;br&amp;gt;&amp;lt;br&amp;gt;&amp;lt;br&amp;gt;Villagers from rural collective land contract warrants visible villagers contracted land use period of 30 years, in general are far from maturity. But villagers,&lt;a href=&quot;http://www.arret-net.fr/link.php&quot;&gt;moncler pas cher&lt;/a&gt;, and they did not consult them when the village and town occupied by agricultural land, but did not address the issue of land compensation or exchange, and even land acquisition announcement did not see before.&amp;lt;br&amp;gt;&amp;lt;br&amp;gt;&amp;lt;br&amp;gt;In 2012, when a number of contracting households Temple village tried to stop the construction team slag pond filling,&lt;a href=&quot;http://reverse-seo.net&quot;&gt;http://reverse-seo.net&lt;/a&gt;, but failed to stop living.&amp;lt;br&amp;gt;&amp;lt;br&amp;gt;&amp;lt;br&amp;gt;Now others have been contracted for the building of the head of the household  said: &quot;! Thus the distribution of land and unreasonable,&lt;a href=&quot;http://blog.cantaman.com&quot;&gt;http://blog.cantaman.com&lt;/a&gt;,&quot; he said, his more than 40 years, a family of three also and old live with their parents in an old house, did not He had assigned land for housing. &quot;Logically speaking, even I, as a subdivision housing contractor, this contract should also be a priority to be given to me.&quot;&amp;lt;br&amp;gt;&amp;lt;br&amp;gt;&amp;lt;br&amp;gt;The villagers said that they were not in favor of old renovation, which is a good thing,&lt;a href=&quot;http://618mv.com/home.php?mod=space&amp;#38;uid=5079&quot;&gt;http://618mv.com/home.php?mod=space&amp;#38;uid=5079&lt;/a&gt;, the problem is the way such problems occupied land. &quot;There should be compensation for lost or otherwise engage in replacement land to our agricultural production, livelihood, right?&quot;&amp;lt;br&amp;gt;&amp;lt;br&amp;gt;&amp;lt;br&amp;gt;Town government response&amp;lt;br&amp;gt;&amp;lt;br&amp;gt;&amp;lt;br&amp;gt;Procedures required by law to go &quot;probably do not&quot;&amp;lt;br&amp;gt;&amp;lt;br&amp;gt;&amp;lt;br&amp;gt;Flower Town deputy mayor in charge of urban construction, Chen said, the allocation of land building, indeed unified town planning. Town a decade ago began planning a comprehensive renovation of rural land, the demolition of some old dilapidated buildings, improve village appearance, the actual work started only recently. The Temple and the village is one of a piece of land for building work, but also according to town land use indicators were unified planning and allocation, and the whole town took this comprehensive land management projects in the planning and approval procedures are not a problem.&amp;lt;br&amp;gt;&amp;lt;br&amp;gt;&amp;lt;br&amp;gt;&quot;Our town land more intense, to the demolition of the old dilapidated out centralized resettlement is bound to relate to the land, and because little available land, there are some building contractors to be used.&quot; Chen, deputy mayor said, But after the demolition of dilapidated old, they have a rehabilitation work, that is to fill the land rehabilitation after land occupied housing, the overall balance of arable land. So the town planning and approval procedures have no problem, the problem is that the village Village Temple uncoordinated contradiction with the villagers.&amp;lt;br&amp;gt;&amp;lt;br&amp;gt;&amp;lt;br&amp;gt;He said that other villages in the land should be compensated, and Temple village without compensation, nor consultation with the villagers contracted recycling, because the situation is more complicated Temple Village, more differences among the villagers, &quot;when you want to take up contracted land He did not press home by households to talk to the contractor coordination. &quot;&amp;lt;br&amp;gt;&amp;lt;br&amp;gt;&amp;lt;br&amp;gt;He said that according to the law, have the right to contract recycling programs,&lt;a href=&quot;http://www.city.uozu.toyama.jp/mmagemergency/mmagMlApp.aspx&quot;&gt;http://www.city.uozu.toyama.jp/mmagemergency/mmagMlApp.aspx&lt;/a&gt;, but in this village, if to do so might make sense.&amp;lt;br&amp;gt;&amp;lt;br&amp;gt;&amp;lt;br&amp;gt;Homeland of the argument&amp;lt;br&amp;gt;&amp;lt;br&amp;gt;&amp;lt;br&amp;gt;The agricultural land planning approval procedures,&lt;a href=&quot;http://www.bilaterals.org/spip.php?article28526&quot;&gt;http://www.bilaterals.org/spip.php?article28526&lt;/a&gt;, &quot;no problem.&quot;&amp;lt;br&amp;gt;&amp;lt;br&amp;gt;&amp;lt;br&amp;gt;Sanmen County Huaqiao Land and Resources Director Yang said that the land in question Temple village comprehensive land management projects in rural town overall planning, there is no problem in the planning and approval process.&amp;lt;br&amp;gt;&amp;lt;br&amp;gt;&amp;lt;br&amp;gt;For warrants not recovered land contract, nor to the villagers land compensation and land replacement and other issues, Director Yang expressed do not know how it was.&amp;lt;br&amp;gt;&amp;lt;br&amp;gt;&amp;lt;br&amp;gt;Land and Resources, said the officer, although no land acquisition agreement signed with the contractor, but the formalities viewed Temple committee had opened levy covering meetings, village representatives have agreed to sign.&amp;lt;br&amp;gt;&amp;lt;br&amp;gt;&amp;lt;br&amp;gt;Huaqiao land resources in the reporter also saw a levy Temple Village area file, explained: &quot;The village does not make compensation for land acquisition project.&quot;&amp;lt;br&amp;gt;&amp;lt;br&amp;gt;&amp;lt;br&amp;gt;Legal red line&amp;lt;br&amp;gt;&amp;lt;br&amp;gt;&amp;lt;br&amp;gt;Agricultural land for housing&amp;lt;br&amp;gt;&amp;lt;br&amp;gt;&amp;lt;br&amp;gt;Approval, compensation Less&amp;lt;br&amp;gt;&amp;lt;br&amp;gt;&amp;lt;br&amp;gt;China's &quot;Town and Country Planning Act,&quot; Article 41 states: In rural, village planning area township enterprises,&lt;a href=&quot;http://www.orangesite.it/temp.php&quot;&gt;moncler outlet milano&lt;/a&gt;, rural public facilities and public construction and villagers housing construction, shall not occupy agricultural land; occupation of agricultural land is really necessary,&lt;a href=&quot;http://recit.cadre.qc.ca/~vision/spip.php?article9&quot;&gt;http://recit.cadre.qc.ca/~vision/spip.php?article9&lt;/a&gt;, should After the relevant provisions of &quot;People's Republic of China Land Management Law&quot; to handle agricultural land conversion and approval procedures, by the city and county governments to urban and rural construction planning departments issued a planning permit.&amp;lt;br&amp;gt;&amp;lt;br&amp;gt;&amp;lt;br&amp;gt;China's &quot;Rural Land Contract Law &amp;amp; nbsp;&quot; Article XVI: contracted land has been expropriated legally occupied, the Contractor is entitled to appropriate compensation according to law;&amp;lt;br&amp;gt;&amp;lt;br&amp;gt;&amp;lt;br&amp;gt;Article 26: the contract period,&lt;a href=&quot;http://www.bbsnewcastle.com/forum.php?mod=viewthread&amp;#38;tid=379125&quot;&gt;http://www.bbsnewcastle.com/forum.php?mod=viewthread&amp;#38;tid=379125&lt;/a&gt;, the Employer shall not withdraw the contracted land. When the contract period, the contractor returned to the Contractor or the Employer to withdraw the contracted land according to law, the Contractor in the contract on the ground of their investment and increase the production capacity of the land, they are entitled to appropriate compensation;&amp;lt;br&amp;gt;&amp;lt;br&amp;gt;&amp;lt;br&amp;gt;Article 53 provides that: any organization or individual against land contract and management rights of the Contractor shall bear civil liability.&amp;lt;br&amp;gt;&amp;lt;br&amp;gt;&amp;lt;br&amp;gt;Article 57 provides that: any organization or individual contractors were forced to land contractual management rights transfer of the transfer is invalid.&amp;lt;br&amp;gt;&amp;lt;br&amp;gt;&amp;lt;br&amp;gt;Article 59 provides that: violation of land management laws and regulations, illegal requisition of land or corruption, misappropriation of land requisition compensation costs, constitute a crime, be held criminally responsible; causes damage to others shall bear damages and other responsibilities.&amp;lt;br&amp;gt;&amp;lt;br&amp;gt;&amp;lt;br&amp;gt;(Original title: Contractor certificate still hand, agricultural land ye been covered floor)&amp;lt;br&amp;gt;&amp;lt;br&amp;gt;
&lt;/p&gt;</description>
</item>

</channel>
</rss>
