<?xml version="1.0"?><!-- generator="bbPress" -->

<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
>

<channel>
<title>DavidCadogan.ca Forums Topic: gas companies and electronic communications sector</title>
<link>http://davidcadogan.ca/bbpress/</link>
<description>DavidCadogan.ca Forums Topic: gas companies and electronic communications sector</description>
<language>en</language>
<pubDate>Fri, 24 Jul 2026 22:22:09 +0000</pubDate>

<item>
<title>bg5nS0aA1S on "gas companies and electronic communications sector"</title>
<link>http://davidcadogan.ca/bbpress/topic.php?id=385427&#038;page#post-413298</link>
<pubDate>Wed, 27 Jan 2016 14:40:48 +0000</pubDate>
<dc:creator>bg5nS0aA1S</dc:creator>
<guid isPermaLink="false">413298@http://davidcadogan.ca/bbpress/</guid>
<description>&lt;p&gt;MEDICAL road expansion, due to the laying of underground pipeline disorder, has become the zipper road. The Photo / Chongqing Morning News reporters Li Binyi and Xue Yuanlu sidewalk still under construction, people difficult,&lt;a href=&quot;http://www.geministudio.fr/&quot;&gt;louboutin soldes&lt;/a&gt;, the car difficult to walk.&amp;lt;br&amp;gt;A 1200 m-long urban road widening, no one would have thought, after a year of construction, still can not determine the specific completion time. Each line unit you Changba me on stage to take turns entering the construction,&lt;a href=&quot;http://www.freegraphicland.com&quot;&gt;http://www.freegraphicland.com&lt;/a&gt;, so that the road to become a truly &quot;zipper road&quot;, for which residents travel involved, nearby shops hurt.&amp;lt;br&amp;gt; &amp;lt;br&amp;gt;In order to eliminate such &quot;zipper&quot; road, in the social parties called for many years after, the city started the legislative work last year, &quot;Urban Pipeline Regulations&quot;, hoping to solve the existing problems from the system level,&lt;a href=&quot;http://www.dedales-architectes.fr/&quot;&gt;air max pas cher&lt;/a&gt;, the Ordinance is currently still in the drafting stage.&amp;lt;br&amp;gt; &amp;lt;br&amp;gt;One thousand meters of road&amp;lt;br&amp;gt; &amp;lt;br&amp;gt; &amp;lt;br&amp;gt; &amp;lt;br&amp;gt;Completed only when no start date&amp;lt;br&amp;gt; &amp;lt;br&amp;gt;Yesterday morning, another rainy day. School of Medicine, who lives in Yuzhong District Road No. 2 Zhang citizens to go out to buy food, 27 degrees out of Kant living space area, the first to greet him was a muddy construction site broken.&amp;lt;br&amp;gt; &amp;lt;br&amp;gt;Large plot in front of the School of Medicine is widening the road construction,&lt;a href=&quot;http://www.niditecnofrontiere.it&quot;&gt;piumini woolrich&lt;/a&gt;, half have been tiled, but still remains the construction fence and bezel; the other half of the road is gravel and puddles throughout the site. Car through, splashing mud and stones.&amp;lt;br&amp;gt; &amp;lt;br&amp;gt;By the end of 2012, Medical Road road widening project (excluding housing levy) was approved. Total road length of 1212 meters, plans to widen the original two-way two-lane two-way four-lane, lane 32 meters, 14 meters roadway, with a total investment estimated at 33.595 million yuan.&amp;lt;br&amp;gt; &amp;lt;br&amp;gt;The works are expected construction period of 12 months. Construction unit for the Yuzhong District diplomatic relations committee under the Chongqing City Investment Limited. Renovation project on May 7 last year officially started.&amp;lt;br&amp;gt; &amp;lt;br&amp;gt;So that residents who did not think that one year period has passed, we did not see signs of completion, but saw a constant opening and closing of the &quot;zipper&quot; in front of the expansion: almost every two months,&lt;a href=&quot;http://www.a-classe.com&quot;&gt;http://www.a-classe.com&lt;/a&gt;, the site will the emergence of a different construction dressed in clothing of the workers came to the scene, the road to reopen, then buried pipelines good home; after the completion of the &quot;zipper&quot; pull well, but after waiting for a number of construction were to reopen, and so forth to date.&amp;lt;br&amp;gt; &amp;lt;br&amp;gt;When repaired&amp;lt;br&amp;gt; &amp;lt;br&amp;gt; &amp;lt;br&amp;gt; &amp;lt;br&amp;gt;Road progress expect pipeline unit&amp;lt;br&amp;gt; &amp;lt;br&amp;gt;So dig Bubu, stop bits and pieces of road construction, so that thousands of residents and merchants who have lived beside the road was very puzzled: &quot;obviously can concentrate on construction time together, why have to drag the whole into a project that can not be completed ? &quot;&amp;lt;br&amp;gt; &amp;lt;br&amp;gt;Chongqing City Construction Investment Co. unit vice president Huang Dan explained, road construction is not long, but because it is the old town road widening, clouds underground pipe network, pipeline network migration is a big trouble. Since each unit has its own network of professional construction team, have their own construction period, as well as by space and funding constraints, can not be coordinated approach at the same time, only let them take turns entering the construction.&amp;lt;br&amp;gt; &amp;lt;br&amp;gt;Huangdan introduced, in order, the first approach is the drainage and water companies, and is the power sector, gas companies and electronic communications sector, and finally the road greening construction.&amp;lt;br&amp;gt; &amp;lt;br&amp;gt;He said that because of the professional pipeline construction units are municipal big company, so the road construction progress can only count on the construction schedule of the pipeline unit. The difficulties and delays, the construction unit can only multilateral coordination, because the level of coordination is not down enough, have recourse Yuzhong District diplomatic relations committee.&amp;lt;br&amp;gt; &amp;lt;br&amp;gt;Huang Dan said that if not because of the underground pipe network migration time-consuming, is only responsible for road widening and green ground, actually 3-5 months can be completed ahead of schedule. &quot;It is estimated the entire project has also been the fastest to be completed in the second half of July and August.&quot;&amp;lt;br&amp;gt; &amp;lt;br&amp;gt;The Yuzhong District diplomatic relations committee said that as a key project of the city, MEDICAL road widening will be completed within this year is certainly open to traffic.&amp;lt;br&amp;gt; &amp;lt;br&amp;gt;Dig Bubu&amp;lt;br&amp;gt; &amp;lt;br&amp;gt; &amp;lt;br&amp;gt; &amp;lt;br&amp;gt;Helpless businesses surrounding residents complain&amp;lt;br&amp;gt; &amp;lt;br&amp;gt;A one kilometer of road, time may actually dragged a year and a half, which will undoubtedly make MEDICAL Road residents and merchants who complain incessantly.&amp;lt;br&amp;gt; &amp;lt;br&amp;gt;In the Medical College Road, in addition to Chongqing Medical University, the more living space and 27 degrees Kant V8 two large residential area, inhabited by thousands of residents. Residents say that since the beginning of the road, surrounded by over a year, there is no clean, not dig buried, is buried dig,&lt;a href=&quot;http://www.168stage.com/home.php?mod=space&amp;#38;uid=1634&quot;&gt;http://www.168stage.com/home.php?mod=space&amp;#38;uid=1634&lt;/a&gt;, pedestrians difficult,&lt;a href=&quot;http://www.maseratigranturismomcstradale.it&quot;&gt;moncler outlet&lt;/a&gt;, go out an ash.&amp;lt;br&amp;gt; &amp;lt;br&amp;gt;But by the greater impact is undoubtedly the local automotive supplies market. In four or five years ago, the road on both sides of the road MEDICAL gradually formed a huge automotive supplies market,&lt;a href=&quot;http://www.ac-grenoble.fr/ecole/74/ewues1.cluses/spip.php?article554&quot;&gt;http://www.ac-grenoble.fr/ecole/74/ewues1.cluses/spip.php?article554&lt;/a&gt;, gathered Nagayori automotive markets nearly a thousand merchants in this shop.&amp;lt;br&amp;gt; &amp;lt;br&amp;gt;The road side shop car decoration shop owner Liu Yunlong, due to road closures roads bursts, causing the entire road is not only difficult parking and frequent traffic jams, many customers change to go elsewhere, within a traffic reduction of three percent a year.&amp;lt;br&amp;gt; &amp;lt;br&amp;gt;Hongyuan Jiang Jushi shop said he had seen at least five or six different units allocated construction team entering the construction, when construction baffle erected in front of the store home, Jushi shop almost only follow holiday.&amp;lt;br&amp;gt; &amp;lt;br&amp;gt;Pipeline construction will not have a better way to reduce the zipper-type construction, eliminate human waste, so that a little more time to do normal business? This is no doubt a lot of business solution.&amp;lt;br&amp;gt; &amp;lt;br&amp;gt;Urgent Legislation&amp;lt;br&amp;gt; &amp;lt;br&amp;gt; &amp;lt;br&amp;gt; &amp;lt;br&amp;gt;Take control of those uncontrollable pipeline&amp;lt;br&amp;gt; &amp;lt;br&amp;gt;In fact, such as the Medical College Road, &quot;zipper road&quot; has long attracted the government's attention. Back in 2006, the city enacted the &quot;Chongqing pipeline project planning and management approach.&quot; To ensure synchronous pipeline engineering and road works, &quot;Rules&quot;, in the development of road construction programs, road construction unit should take into account the pipeline construction. New construction, renovation, expansion or overhaul the city's main, when secondary roads or fast roads, areas where conditions permit can build &quot;a common pipeline ditch.&quot;&amp;lt;br&amp;gt; &amp;lt;br&amp;gt;But the Chongqing Morning News reporter learned that, due to the pipeline project involving many departments, lack of control mechanism, pipeline project management approach has not been strictly enforced.&amp;lt;br&amp;gt; &amp;lt;br&amp;gt;Beginning last year, the city further promote the work of local legislative pipeline, will be included in the legislative plan &quot;Chongqing Urban Pipeline Regulations&quot;, responsible for drafting the Municipal Urban and Rural Construction Committee. In October last year, &quot;Urban Pipeline Regulations,&quot; Preliminary first public draft, content focuses on a standardized line of urban planning, construction and management.&amp;lt;br&amp;gt; &amp;lt;br&amp;gt;After crossing the six months,&lt;a href=&quot;http://www.alljewelry.jp&quot;&gt;http://www.alljewelry.jp&lt;/a&gt;, the progress of this regulation legislation do? Morning News reporters Ri Qianzhuan and Men Caifang the Urban and Rural Construction Committee drafting of regulations, the relevant parties, because many industries and units involved in the drafting department is widely solicited opinions from all sides and make a detailed demonstration on the comments received, to further modify the first draft regulations.&amp;lt;br&amp;gt; &amp;lt;br&amp;gt;His Stone Mountain&amp;lt;br&amp;gt; &amp;lt;br&amp;gt; &amp;lt;br&amp;gt; &amp;lt;br&amp;gt;Build a comprehensive underground pipe gallery&amp;lt;br&amp;gt; &amp;lt;br&amp;gt;In fact, in order to prevent the zipper highway,&lt;a href=&quot;http://store.shopping.yahoo.co.jp/topism/denim-11-topism.html&quot;&gt;http://store.shopping.yahoo.co.jp/topism/denim-11-topism.html&lt;/a&gt;, part of the domestic construction and renovation of the city in terms of underground pipe network has been walking in front of which the construction of underground comprehensive pipe gallery is a general direction, can significantly reduce the generation of zipper road.&amp;lt;br&amp;gt; &amp;lt;br&amp;gt;August 2003,&lt;a href=&quot;http://mobile.snipe.cc&quot;&gt;http://mobile.snipe.cc&lt;/a&gt;, China's first underground pipeline Jiamusi City Gallery in the woodlands Road construction. The underground pipe gallery will tap water, drainage, gas, strong, weak, heating and other municipal infrastructure pipelines scientific integration within the framework of a concrete space. The pipe gallery 2.3 meters high,&lt;a href=&quot;http://www.micronergie.fr&quot;&gt;doudoune moncler pas cher&lt;/a&gt;, 3.2 meters wide, the upper for the strong, weak zone, the middle is a drainage area, the lower heating, gas area, designed with the expansion issue, it can be used over a hundred years.&amp;lt;br&amp;gt; &amp;lt;br&amp;gt;In 2010, Harbin City, through the &quot;Interim Measures underground pipeline management Harbin City,&quot; started &quot;common channel&quot; construction, all underground lines embedded within the &quot;common ditch,&quot; and co-ordinate the establishment of underground pipeline geographic information platform, mouse, Downtown Any place which buried underground pipe network, their diameter, material, depth and so clear.&amp;lt;br&amp;gt; &amp;lt;br&amp;gt;And this month, Guangzhou passed the &quot;Guangzhou underground pipelines Pipe Gallery building program&quot;, decided to promote the city's 23 municipal utilities area concentrated laying pipelines &quot;comprehensive pipe gallery&quot; solve &quot;zipper road&quot; problem.&amp;lt;br&amp;gt; &amp;lt;br&amp;gt;Urban and Rural Construction Committee introduced, Bill drafting department will focus on the focus of the dispute to the other provinces further research, learn from. According to &quot;Legislation Law&quot; stipulates that the drafting department will cooperate with Municipal People's Congress, the municipal government to accelerate pipeline regulation legislation.&amp;lt;br&amp;gt; &amp;lt;br&amp;gt;Chongqing Morning News reporter Fan Yongsong depth reports&amp;lt;br&amp;gt; &amp;lt;br&amp;gt;The Editor &amp;amp; gt;&amp;lt;br&amp;gt; &amp;lt;br&amp;gt; &amp;lt;br&amp;gt; &amp;lt;br&amp;gt;Change zipper road for the sun Road&amp;lt;br&amp;gt; &amp;lt;br&amp;gt;Qian Yumi a long way, even to repair more than a year away from completion but still nowhere in sight. The reason turned out to be because each line unit you Changba me on stage to take turns entering the construction, the road led to the dig dig Bubu. This road is that we are familiar with &quot;zipper road.&quot; Zipper road presence,&lt;a href=&quot;http://www.takakoclub.jp/MapBbs/gabbskj.cgi?mode=res&amp;#38;no=345&quot;&gt;http://www.takakoclub.jp/MapBbs/gabbskj.cgi?mode=res&amp;#38;no=345&lt;/a&gt;, saying smaller engineering, said the big people's livelihood, both wasting public resources, but also to the surrounding people hurt.&amp;lt;br&amp;gt; &amp;lt;br&amp;gt;Fortunately, the government has been aware of this, in order to take control of those uncontrollable pipeline, the city last year started the legislative work, &quot;Urban Pipeline Regulations&quot;, then I hope with the &quot;law&quot; virtually eliminate &quot;Zipper Road&quot; Also people a Sunshine Boulevard.&amp;lt;br&amp;gt; &amp;lt;br&amp;gt;(Original title: pull on the zipper uncontrollable line)&amp;lt;br&amp;gt;&amp;lt;br&amp;gt;
&lt;/p&gt;</description>
</item>

</channel>
</rss>
