<?xml version="1.0"?><!-- generator="bbPress" -->

<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
>

<channel>
<title>DavidCadogan.ca Forums Topic: 929F1f6K51</title>
<link>http://davidcadogan.ca/bbpress/</link>
<description>DavidCadogan.ca Forums Topic: 929F1f6K51</description>
<language>en</language>
<pubDate>Wed, 22 Jul 2026 11:02:11 +0000</pubDate>

<item>
<title>wp5odufa3s on "929F1f6K51"</title>
<link>http://davidcadogan.ca/bbpress/topic.php?id=411024&#038;page#post-439137</link>
<pubDate>Tue, 26 Apr 2016 18:16:01 +0000</pubDate>
<dc:creator>wp5odufa3s</dc:creator>
<guid isPermaLink="false">439137@http://davidcadogan.ca/bbpress/</guid>
<description>&lt;p&gt;The village committee office building construction has entered the end.&amp;lt;br&amp;gt;Recently, a building area of 4480 square meters, cost more than 300 million of the village committee office building quietly in Changzhou Wu road. Eye-popping is building three &quot;luxury&quot; office building is now being reported undocumented illegal buildings. Yesterday, the Express reporter conducted an interview survey found that this office building built by Changzhou Tianning lanling renaissance village streets, this building is currently no &quot;birth certificate&quot; of the building construction is almost complete, and the village committee said, the relevant procedures They are processed. Yesterday, reporters also learned, Tianning District Commission for Discipline Inspection has been involved in the investigation.&amp;lt;br&amp;gt; &amp;lt;br&amp;gt;Express reporter trainee reporter Yao Bin Zhou Qing&amp;lt;br&amp;gt; &amp;lt;br&amp;gt;Site: near the end of construction of the building under renovation&amp;lt;br&amp;gt; &amp;lt;br&amp;gt;Yesterday 9:00, the reporter Wu Changjiang Road Crossroads Boulevard and southeast seen at over 200 meters, a three-storey building facing the street has begun to take shape, the building from the non-motorized vehicles not more than 10 meters, from the appearance point of view is quite luxurious. Reporters saw the outside of buildings surrounded by a row of blue color steel plate, floor to overhead layer, 2-3 floor is office space. Body frame building has been built, the street stucco facades also finished building the north and south ends of the room to install a black aluminum floor windows. Other windows of the second floor office space is also a basic installation completed.&amp;lt;br&amp;gt; &amp;lt;br&amp;gt;Reporters went into the building, five or six construction workers ongoing interior decoration. In the back of the building,&lt;a href=&quot;http://www.lorenzolodi.it&quot;&gt;scarpe mbt outlet&lt;/a&gt;, the reporter saw dense scaffolding vertically, climb on top of several workers are stucco exterior. At the door after the site, the reporter saw the construction notices column does not plan drawings, a kind of brand construction qualification, only two damaged advertising paper. According to the site introduction worker who is working, the entire building has now entered the final work fast, then more than 10 days may be all over. The remaining work is interior work, simple words can be moved into the building office in June.&amp;lt;br&amp;gt; &amp;lt;br&amp;gt;Villagers: The building is more than 300 million illegal buildings&amp;lt;br&amp;gt; &amp;lt;br&amp;gt;In the revival of the village, a 40-year-old villager surnamed Wang told reporters, that building is the renaissance village is building a new office building started in March of this year, did not go through any formalities, an area of 4,000 square meters, the entire cost is about 300 million. &quot;A village a few people, you need to build a big office building it?&quot; The villagers said, the whole village together with various village groups less than 20 people, built a 4,000 square meters of office buildings so the extravagance.&amp;lt;br&amp;gt; &amp;lt;br&amp;gt;See reporter to interview a villager said angrily, village new building is nearing completion, and the revival of the village and now even a decent farms are not, the villagers for this village many times to mention, the construction of farms already address selected, but still have not seen started. Another aunt also told reporters reflect: &quot;1 floor building new village reason cause elevated levels, in order to later when the facade rental, of course, rental income and certainly nothing to do with the people.&quot;&amp;lt;br&amp;gt; &amp;lt;br&amp;gt;Village: building relevant procedures are being processed&amp;lt;br&amp;gt; &amp;lt;br&amp;gt;Subsequently, the reporter went to the temporary office point of the revival of the village committee. This is a two-story general office building, close to the new office building under construction. In the Director's Office, 1st Floor, reporters saw the revival of the village committee director Yuan Xudong, that reporters had come, Yuan Zhuren somewhat excited.&amp;lt;br&amp;gt; &amp;lt;br&amp;gt;&quot;Making the building is not my personal behavior, this is for the villagers and the village committee staff services.&quot; Yuan Zhuren said angrily, village revival of the old office building in the original Wu Avenue and the Yangtze River Road intersection northeast side, because Wu Avenue reconstruction, has now all been dismantled. No place can only rent the village committee office building a local business temporary transition, build a new office building also imminent. The end of February this year,&lt;a href=&quot;http://store.shopping.yahoo.co.jp/cio/n0100100880.html&quot;&gt;http://store.shopping.yahoo.co.jp/cio/n0100100880.html&lt;/a&gt;, the new building started.&amp;lt;br&amp;gt; &amp;lt;br&amp;gt;According to Yuan Zhuren introduction, the new office building was originally the location of a few old cottage enterprises can not meet the needs of the village committee office, so the village has held a villager congress, party conference, the final decision in this place to build a new village committee office. When a reporter asked whether the villager congress facie record, Yuan Zhuren said that it has seen many times to other media, it is not necessary to show.&amp;lt;br&amp;gt; &amp;lt;br&amp;gt;Then, build a new office building in front of the village committee whether certain provisions apply? Yuan Zhuren explained, because Wu Avenue renovation of the old building approach relevant departments initially split half of the remaining half, then suddenly require all demolished, but building a new building procedures are not half past one will be able to run,&lt;a href=&quot;http://www.gymfan.com/board/step.cgi?mode=view&amp;#38;no=650&quot;&gt;http://www.gymfan.com/board/step.cgi?mode=view&amp;#38;no=650&lt;/a&gt;, only the first village He rented a place now as a temporary transition. In front of the new building commenced village streets to submit a report on the construction of new buildings as well as other information on the project. &quot;There are side formalities edge construction.&quot;&amp;lt;br&amp;gt; &amp;lt;br&amp;gt;For villagers village less than 20 staff, the construction of more than 4000 square meters of office whether extravagance? Yuan Zhuren said that at present more than 1,000 permanent residents Renaissance Village, rented foreign staff of nearly 3,000 people, four Chinese city district near the more than 900 residents will also be hosting the revival of the village committee. Although the village is only now,&lt;a href=&quot;http://store.shopping.yahoo.co.jp/gion/sv-15.html&quot;&gt;http://store.shopping.yahoo.co.jp/gion/sv-15.html&lt;/a&gt;, more than 20 staff members, but as with all sectors to improve, the staff will be increased. According to Yuan Zhuren introduction, the new office has now invested more than 200 million, the village committee relevant procedures are being processed.&amp;lt;br&amp;gt; &amp;lt;br&amp;gt;However,&lt;a href=&quot;http://www.mydesktop.fr/&quot;&gt;Chaussures louboutin&lt;/a&gt;, the reporter learned from the organization department of Changzhou, like this village grassroots organization, manning of staff is: 3000 The following are 4-5 staff members; more than 3,&lt;a href=&quot;http://www.mydesktop.fr/&quot;&gt;Chaussure louboutin pas cher&lt;/a&gt;,000 people are no more than 5-7 people.&amp;lt;br&amp;gt; &amp;lt;br&amp;gt;Street: Building construction village has not received reports&amp;lt;br&amp;gt; &amp;lt;br&amp;gt;Yesterday morning, the reporter went to the Lan Ling district offices. Lu Kai Office briefed reporters, it is due to the revival of the old building in the village of Wu Avenue reconstruction dismantled. Because the building is located in the Yangtze River Road intersection with Avenue Wu, after the completion of the transformation of the intersection pedestrian walk ways to use the underground passage, and an outlet underpass just in the old building at the revival of the village committee, it requires the removal of all buildings .&amp;lt;br&amp;gt; &amp;lt;br&amp;gt;For the revival of the village committee is illegal to build a new office building issue, Lu Zhuren showing street already know this. But before the village has not received any reports submitted for the construction of the new building. Lu Zhuren said, no streets approval and licensing authority, the relevant formalities shall be declared by the village directly to the District Planning Bureau, the Municipal Planning Bureau. Streets that matter, have opened offices in the May 14, asking them to immediately stop work.&amp;lt;br&amp;gt; &amp;lt;br&amp;gt;In the case of the building still under construction in the village, Lu Zhuren frustration that street as Tianning government agency, the power is very limited. To this end, the district government has repeatedly convened meetings are discussing the matter of treatment options.&amp;lt;br&amp;gt; &amp;lt;br&amp;gt;Urban management: If serious impact on planning law will be removed&amp;lt;br&amp;gt; &amp;lt;br&amp;gt;Yesterday afternoon, reporters from Changzhou City Administrative and Law Enforcement Detachment was informed that,&lt;a href=&quot;http://store.shopping.yahoo.co.jp/topism/denim-38.html&quot;&gt;http://store.shopping.yahoo.co.jp/topism/denim-38.html&lt;/a&gt;, for the revival of the village committee office regarding illegal construction, urban brigade official told reporters, after they get the report, to take immediate action, and May 17 to recovery the village committee issued a &quot;notice period provided legal procedures&quot;, asking them to within three working days of urban management department issued the relevant procedures. To June 1, the revival of the village committee has not provided procedures.&amp;lt;br&amp;gt; &amp;lt;br&amp;gt;The official also told reporters that the current law enforcement detachment preliminary investigation has been completed, the recent survey data will be forwarded to the Changzhou Municipal Planning Bureau, Planning Bureau by the relevant departments that affect the urban planning office. If serious impact on urban planning and cityscape, urban management department will be dismantled according to the law.&amp;lt;br&amp;gt; &amp;lt;br&amp;gt;Planning Board: are undocumented illegal construction&amp;lt;br&amp;gt; &amp;lt;br&amp;gt;Yesterday,&lt;a href=&quot;http://store.shopping.yahoo.co.jp/ebest-dvd/0000001020388.html&quot;&gt;http://store.shopping.yahoo.co.jp/ebest-dvd/0000001020388.html&lt;/a&gt;, the reporter went to Changzhou planning to monitor the detachment to understand the situation, according to Xu Guangwei Supervision Detachment Vice Captains,&lt;a href=&quot;http://store.shopping.yahoo.co.jp/ebest-dvd/0000000939575.html&quot;&gt;http://store.shopping.yahoo.co.jp/ebest-dvd/0000000939575.html&lt;/a&gt;, said the revival of the village committee to the City Planning Board did not apply for &quot;construction project planning license&quot;, May 14 morning, he has led the law enforcement officers revival of the village committee to survey the construction of the office building, and the village to find the person in charge to understand the situation. Look down from the case investigation, the revival of the new village committee office building really belongs undocumented illegal construction.&amp;lt;br&amp;gt; &amp;lt;br&amp;gt;As to whether the impact of the building of urban planning, said Xu Guangwei After a review of relevant materials, from the point of view topographic maps, the building from the actual road red line is only eight meters, whether the impact of urban planning by the Planning Bureau and finally had to demonstrate the technology sector. On a topographic map provided by Xu Guangwei, the reporter saw the revival of the new village committee office building 85.9 meters long and 12 meters wide, building area of 4480 square meters,&lt;a href=&quot;http://www.casualloveweek.it&quot;&gt;mbt outlet&lt;/a&gt;, including elevated levels of 1041.34 square meters.&amp;lt;br&amp;gt; &amp;lt;br&amp;gt;Xu Guangwei, in accordance with the Changzhou municipal government in 2006 No. 29 document stipulates that in the urban planning area, approved by the department without planning, without renovation, expansion, new buildings, structures and other facilities, severely affecting urban planning and cityscape,&lt;a href=&quot;http://www.milumo.jp&quot;&gt;http://www.milumo.jp&lt;/a&gt;, be dismantled by the city administration Bureau. If the unauthorized construction without planning department approval, although the impact of urban planning, but can still take corrective and other remedial measures,&lt;a href=&quot;http://www.menqiu.com/bbs/home.php?mod=spacecp&amp;#38;ac=blog&amp;#38;blogid=&quot;&gt;http://www.menqiu.com/bbs/home.php?mod=spacecp&amp;#38;ac=blog&amp;#38;blogid=&lt;/a&gt;, technical demonstration organized by the City Planning Bureau, rectification, Municipal Urban Administration Bureau ordered rectification,&lt;a href=&quot;http://www.inmugello.it&quot;&gt;mbt outlet&lt;/a&gt;, and impose fine.&amp;lt;br&amp;gt; &amp;lt;br&amp;gt;Finally, for the revival of the village committee this case, whether to go through relevant procedures, Xu Guangwei expressed need to wait after the city planning bureau for technical feasibility studies, before they decide whether to do.&amp;lt;br&amp;gt;&amp;lt;br&amp;gt;
&lt;/p&gt;</description>
</item>

</channel>
</rss>
