<br>"The house every year to subsidence, really afraid when collapsed." Yu Haiyuan district,canada goose pas cher, Haidian District,http://517419.com/forum.php?mod=post&action=newthread&fid=124&extra=&topicsubmit=yes, many residents jointly to "Legal Evening News" wrote, reflecting the residential housing quality problems. This morning, residential developers, said the property will send someone to understand the situation this week.<br> <br>24 joint letter to France late to help the owners<br> <br>Recently, the newspaper received a letter from the Yu Haiyuan district residents, the letter mentioned the existence of the cell surface subsidence, bulk water sink housing, shoddy construction materials, pipes collapse and other issues. Inscription left at the owner's signature 24.<br> <br>Recently, the reporter went to the district, the property responsible Zhujing and Hou Zhuren introduced the details of the problem floor. According to reports, Yu Haiyuan cell into a mile,http://cyobi.sub.jp/cgi/link2/apeboard_plus.cgi?comma/, two miles and three years, are resettlement housing,http://tuonela.s138.xrea.com/lightbbs/light.cgi?res=8932, respectively in 1997, 1998 and 2001 completed stay.<br> <br>Mr Zhu said that the House of cracking the case was first discovered in 1999,http://www.sunrise-blvd.co.jp, the first residents to move about 2 years, Yu Haiyuan there a few cracks appeared in the House. In the ensuing 15 years, it has emerged houses sinking, ground subsidence and pipeline collapse phenomenon.<br> <br>Hou Zhuren told reporters that at present, Building 14 Yu Haiyuan a mile, two miles of Yu Haiyuan Yu Haiyuan Building 11 and Building III 1,2,9,11,14,http://framasoft.net/spip.php?article2974,25 and 26 appeared in both floor subsidence and cracks and other issues.<br> <br>Visit more problems with cracking buildings can be inserted into a gap fist<br> <br>Yu Haiyuan three years are the most frequent problem areas, a total of seven buildings there is a problem. Reporters followed Three Mile Long Building, 14th Floor, Building 1, Wang Shengli came to see, one of the multiple cracking exterior walls, cracks can be stuffed two fingers.<br> <br>In Building 14,http://bbs.smnet.com.cn/home.php?mod=spacecp&ac=blog&blogid=, the entire bottom floor has a 15-20 cm wide cracks, Mr Zhu property is easily a fist into the stretch. Wang Shengli told reporters that this is caused by the sinking of the House,http://youzhemei.cn/forum.php?mod=viewthread&tid=27963, the House of sinking every year, so the crack is getting wider. 11 years on the second floor basement, walls cracked a treaty three meters long, 2 refers to the wide gap.<br> <br>In addition, the property Mr Zhu told reporters,canada goose solde, cell collapse occurred many times and pipe clogging pipes, water pipes burst,louboutin pas cher, the plumbing block and back up water situation also occurred. Cell floor had collapsed several times each year.<br> <br>Mr Zhu said that in 2011,http://firstmonday.org,hogan outlet online, Haidian District Construction Commission jointly Xiaoqu Ban more than 10 units, and cooperative housing qualification of experts to identify the cell had a back. At that time, experts say: "Do not rule out the housing quality problems, but does not affect the normal use." But this statement, residents do not agree.<br> <br>Many residents are worried that, shortly before the collapse of Zhejiang Fenghua resident room will be staged in the area.<br> <br>Interrupted make demands district residents live Construction Committee to assist the developer detection<br> <br>Reporter linked to Yu Haiyuan cell developers - Beijing Real Estate Co., Ltd. to open sea,louboutin soldes, Office Director Wang said that is not clear and Yu Haiyuan cell problem and needs to consult the head office, to give reporters reply.<br> <br>This morning, reporters once again contact the Beijing Real Estate Co., Ltd. to open sea, Office Director Wang responded that the company knew about the matter very seriously, this week will be to understand the situation Yu Haiyuan residential property, then the matter will be answered.<br> <br>This morning, the Haidian District Construction Committee building industry Administration Master Xiping, said Yu Haiyuan cell issue dragged a long time, a lot of problems can not be summarized. Before the developers find the relevant departments of the individual floor sampling done, but on the district as a whole has not done testing. Cause of Collapse whether dangerous and ground can not be conclusive.<br> <br>"Owners do not reflect the matter to the Municipal Construction Committee, Construction Committee did not receive any written application, superiors nor had issued instructions." Xiping, he said residents can make testing requirements to developers, housing construction commission will assist detection.<br> <br>Text and photo / Legal Evening News reporter Ma Xiaoqing<br> <br>(Original title: newspaper received a joint letter reflects Yu Haiyuan district residents more buildings exist quality problem areas Municipal Construction Committee, said the lead developers need to do testing)<br><br>
DavidCadogan.ca Forums » DavidCadogan.ca
two miles and three years
(1 post)-
Posted 10 years ago #
Reply
You must log in to post.