Two office buildings, left for Building 2, Building 1 on the 1st and right for three or four office building used as office<br>Lu'an City District Office leaf collection test Quzhen East Building Village Committee just five village cadres, actually built more than 5000 square meters of office buildings, office space is removed, the local masses, "The village will be built Some office buildings as real estate for sale. "<br> <br>& Nbsp; & nbsp; & nbsp; & nbsp; December 8,CN121uJ1oW, reporters at the scene investigation found that the East Wing where the village committee office building a total area of over 5000 square meters,SAmH1016z9, far beyond the original planning area, some houses have been "buy", and some are being renovated.<br> <br>Faced with "for sale" questioned office, the village cadres explained:. "Building is not sold, it is a long-term lease, the lease for 25 years."<br> <br>Office real estate sale transfiguration?<br> <br>Ye set test area to the newspaper reflected Mr. Zhang Lu'an City, East Wing, said the district built village committee office building, a building with five floors, another building is six. "The village cadres only five people, only one part of a building used as office floors, while the other buildings were sold village cadres."<br> <br>Zhang believes that the office building was sold so that he can not understand the village cadres, "how the building is used as office can become real estate for sale?"<br> <br>Mr. Zhang also reflected, only five office staff committee "simply impossible a few thousand square meters of office",peuterey outlet, "since it is the government allocated land, how can build housing for sale?" Village built two office House, "is engaged in real estate development."<br> <br>Spend one million yuan building renovation<br> <br>December 8, the reporter went Lu'an City District Office leaf collection test Quzhen Village East Building,2RUTcC1d0k, reporters in the area (West Anhui Road south) saw two gray layer were 5 and 6-storey building. Zhang said, as the East Building, Building 1, west of the village office building.<br> <br>Reporters saw in the 1st building, the building is used as Layer 3 and Layer 4 office,nQ3a9EMraH,parajumpers femme, it has been decorated. The two floors are provided "VIP reception." Reporters saw up to nearly 10 monitoring probes, fitness equipment are readily available inside and outside the building, decoration is also very elegant. Ye set test area Lu'an City East Building village accountant said: "decoration fee office spent about $ 1 million, office equipment through the tender spent more than 20 million."<br> <br>Part of the office building has been "sold"<br> <br>Reporters saw in Building 2, 1st floor of the buildings there are few families being renovated. According to a "homeowner" describes, his house is from the East Building Village Committee "buy", renovated after preparing to open a restaurant. "In accordance with the standard three or four thousand per square meter bought." As for the upstairs house, the owner said that the rate is about 2000 yuan / square meter.<br> <br>Reporters saw the words "the East Building of the village committee" between three and four on Building 1. Reporter to the identity of buyers to the building where the guard duty room to ask the guard said, Building 2 dressing rooms have been "for sale."<br> <br>"To buy homes, it seems there are several sets of only six floors, others are sold." The guard said,air max 90, Building 1,canada goose pas cher, no foreign sales, the building may be 1 layer, 2 layer and five-layer overall rent, 3 layers and 4 layers are the village office.<br> <br>Beyond the planning office space<br> <br>According to Zhang Shanlu introduction, the village two buildings is to start construction in 2010,c5xVD0B30F, had planned for office use. provided in two buildings of "planning permit" to see the two buildings nature of land for "office", land area of 1080 square meters, the construction scale of 5,000 square meters. "Land certificate" on the right to use the type of "appropriation."<br> <br>In a "building in the village on the East Wing of the village committee office to consult the community integrated services", the reporter saw the "test area in accordance with the master plan, the main construction of four, five locally built,B2dmBC7MdU, with a total construction area of 4,500 square meters, two office buildings cost about 360 yuan, "the words. Zhang Shanlu said two buildings construction area of over 5000 square meters, exceeding the original planning area.<br> <br>"Not for sale, is a long-term lease"<br> <br>Zhang Shanlu said, Building 1, 3 and 4th floors used as office, the remaining three will be rented out as a whole, "Some time ago, a businessman talked to, because there is no talk about a good rental prices, there is no rent out."<br> <br>As for the question whether to sell, Building 2, Zhang Shanlu explained to reporters: "Not for sale,NTzO27942L, is a long-term lease." He added: "lease period of 25 years, rent for a one-time charge, according to the housing area, housing rent per square meter 2000 yuan 25 years after the rent to talk about it. "<br> <br>The reporter through his lawyer informed, in accordance with the Contract Law Article 214 stipulates that the lease period shall not exceed two years, more than two years, the exceeding part shall be invalid.<br> <br>Lu Wan & nbsp; & nbsp,HJG8vWPzFL,canada goose solde; Kuen text / photo<br> <br> Share: welcome to comment I want to comment<br> Microblogging Recommended | today's hot microblogging<br>
DavidCadogan.ca Forums » DavidCadogan.ca
kLcjewfK9U
(1 post)-
Posted 10 years ago #
Reply
You must log in to post.