DavidCadogan.ca Forums » DavidCadogan.ca

hogan bambina said the mayor

(1 post)
  • Started 10 years ago by lm6i8d4177

Tags:


  1. <p> Kinmen county government is evading wuqiu Township "referendum" could not source basis.Taipower executives said helplessly, so it ponder imitation Netherlands,hogan uomo, Switzerland build "a centralized temporary storage field", as the low-level nuclear waste temporarily stored at.Kinmen Environmental Protection Bureau: do not consider the uninhabited islandTaipower storage of low-level nuclear waste in Orchid Island Orchid Island storage site,scarpe hogan donna, the lease expires this year,hogan scarpe, Orchid Shaman Jeduthun,hogan bimbi, animal husbandry, said the mayor, according to the contract to the end of the year should be cleared finished hall will not extend the contract.</p>

    <p> resulting in schedule delays siting 2 years.Taipower delays Penalty NT $ 50 millionHe said,hogan roma, "the original can be" last year,hogan sito ufficiale, we have repeatedly written to deal with the migration requirements for Taipower,hogan outlet on line, if not promise to open a penalty. If next year "referendum" well location, environmental assessment, construction has completed five years is expected to move out of low-level nuclear waste on Orchid Island will. If the site can not be completed next year, the highest annual Taipower fear fined 50 million yuan (NT).Taipower executives lamented, had this year in Taitung and Kinmen Darren wuqiu a two candidate sites, but Taitung long leave words "will not help the office vote" through a referendum election.</p>

    <p> lease expires this year, pass "Little Orchid Island" may also become temporarily set locations. Pictured Orchid Island Taitung storage sites, remote Orchid Island is a small uninhabited. (Taiwan's "China Times" photo)BEIJING, Oct. 23, according to Taiwan's "China Times" reported that low-level nuclear waste stored on Orchid Island migrated to final disposal, delayed not finalized,hogan italia, Taiwan's "original can be chairman,spaccio hogan," said Taipower can not be completed if the election next year site,hogan interactive donna, "the former might" have asked Taipower to mention alternative plan.Taipower said it has thinking "way station" program, looking for an uninhabited island in the west coast of Taiwan or sparsely populated island,hogan 2015, built a temporary "centralized storage sites." Location expected to be elected in September next year, probably settled near the island of Kinmen, Taiwan Orchid Island will be first on the island of 10 million barrels of nuclear waste storage barrels moved over.Taipower said that the temporary storage point final disposal sites have different laws and regulations, not to be a "referendum",hogan scarpe, such as the final choice of the island are still a few residents, will be coordinated manner subsidy migration."Original can be" budget was reviewed yesterday,hogan interactive, the KMT "legislators" Kong Wenji requirements as soon as possible in accordance with regulations urge Taipower, next year to complete the migration of nuclear waste on Orchid Island "referendum" and site selection.Cai Chunhong said Taipower promised next year to promote the councils 'referendum' process low-level nuclear waste final disposal, as well,hogan donna, is expected to 5 years to complete the construction and relocation. However, no binding regulations on the local,hogan scarpe, local will not necessarily do so.Kong Wenji criticism,hogan rebel, migration delays on behalf of the "original can be" supervised ill. Cai Chunhong explained,hogan 2014, "ministry" in 2012 approved Taitung and Kinmen wuqiu Darren list of candidate field,hogan estive, as long as either through "referendum" Even if the site is determined. But unwilling to cooperate with the local city government to do the "referendum".</p>

    相关的主题文章:

    Posted 10 years ago #

RSS feed for this topic

Reply

You must log in to post.