Just more than a year of cement bridge dismantled into a heap of ruins<br>"Just spent more than a year of Newbridge, said demolition on the demolition of the how? Take Yiershiwan to who is going to?" Recently,peuterey outlet, members of the public told reporters reflect, Xishan District of Wuxi Northeast Tong Street began in late 2008 Bridge by transformation, the transformation of the old bridge on the river agriculture Pa farming has become a new concrete bridge, completed last year bridge acceptance and formally put into use. But now,peuterey prezzi, the local government actually Chaiqiao again start to build a bigger bridge span. Why less than two years on the demolition of the reconstruction? Why did not foresee the bridge span is not enough? Many local villagers was full of doubt.<br> <br>Event<br> <br>The newly built concrete bridge demolished<br> <br>Yesterday, the reporter went to the Northeast Agricultural Pa Tong Yang Bridge, see the connection agriculture Pa Yang Village and a concrete bridge has been substantially removed, a large excavator is digging bridge pile debris.<br> <br>Local villagers Wang told reporters, July 27, when he was walking on the field to see the New River farmers build more than two years before the cement bridge collapsed,air max femme, and asked the construction workers to know that the above let demolished. According to Mr. Wang, originally a simple bridge over the New River farmers, the end of 2008, the local government demolished a simple bridge,http://www.etoio.cn/thread-32948-1-1.html, began this new concrete bridge. In 2009, the cement bridge formally completed last year, officially put into use.<br> <br>"To say how good a new bridge demolition on the demolition of it?" Mr. Wang said, we all think this is a waste, as well as the villagers joked this cement bridge as "short-lived bridge."<br> <br>WCB<br> <br>Demolition of the reconstruction of flood control needs<br> <br>Reporters learned that the sector is the Xishan Chaiqiao Water Conservancy Bureau. Yesterday, the council's chief told reporters Huaqin wind,http://recit.cadre.qc.ca/~vision/spip.php?article7, removed the concrete bridge to the city last year the implementation of the project of "Win Big East surrounded by the river project",http://wang998.test.tqiyi.org/home.php?mod=space&uid=111521, the project involved farmers New River, Bashi River, Yang Bridge Creek and other 6 river, with a total investment of more than 7400 million. Project includes renovation of the existing comprehensive river, river dredging extension, old bridge removal, etc., the role is to improve the flood control zone city of Wuxi. Remove the cement bridge is part of the project, it plans to widen the mouth of the original 15 meters to 25 meters, and enhance the discharge capacity of the river. Huake Zhang said that after the cement bridge Chai Wan,http://demo2.8555.net/2037_9463/news/html/?53475.html, will build a new bridge span of 25 meters in the original river.<br> <br>If the bridge project has already put on the agenda, then who had approved the construction of this project does not meet the requirements of the cement bridge? A staff member revealed Xishan Water Conservancy Bureau, the cement bridge was built in Northeast Tong Street, had their pond and former director of the Northeast communicated privately street so the bridge does not agree, as the later is how the cement bridge made out of,http://yunkog.com/forum.php?mod=viewthread&tid=681292&fromuid=14644,piumini woolrich outlet, they do not know.<br> <br>Street<br> <br>Cement bridge was built before the plan was finalized in<br> <br>Dongbeitang streets Xu Zhuren explained, when the 2009 bridge,http://bbs.tt919.com/read.php?tid-293888.html/read.php?tid-293888.html/post.php?fid=252?fid=252, "Canal surrounded plan" has not been determined. He told reporters that the second half of 2008, Xishan District, the region's unified bridge inspection, the simple farmers new bridge on the river identified as a dangerous bridge, through consultations and experts relevant departments, Northeast Tong Street at the end of 2008 began to build cement bridge . At that time, the width of the river is 15 meters, so the span concrete bridge for 15 meters, at a cost of about 20 million. Questions about the bridge span, Xu Zhuren explained, was "surrounded Canal Plan" is only a concept, farmers New River could be broadened and more just a guess, they could not conjecture on unauthorized widening river. The main thing is, though it was proposed WCB staff 15 meters span bridge may not be enough, but as to broaden the number of meters, no one can give an answer, even if they also agreed to broaden the place to start.<br> <br>Suggestions<br> <br>Rational planning to eliminate waste<br> <br>Northeast Tong streets stakeholders admitted that funding to build a cement bridge area, and the "Canal surrounded plan" is a given city. If the "Canal surrounded plan" plan is long-term planning given district, when they start building also consider how convergence. The city is now planning to introduce new, they are difficult to prepare in advance.<br> <br>The official pointed out, the pace of development in Wuxi fast, repetitive construction "bridge short-lived" and the like are often found in newspapers. This year, once it had Jincheng Road, Lake Avenue and several excavation within a few years, and several fixes. Every relevant departments have "legitimate reasons", but in fact it is a waste of taxpayers' money. This "short-lived bridge" to use more than a year in the city dismantled in fact reflects the rapid development, short-term planning and long-term planning,http://bbs.365tom.net/forum.php?mod=viewthread&tid=2210, local planning and global issues such as planning and insufficient convergence. To solve this problem among government departments need to better harmonization,louboutin homme,http://wzenyu.com/home.php?mod=space&uid=31218, more careful treatment of urban planning and development.<br> <br>Express reporter Kim Jin Yi Tang text / photo<br> <br>Welcome to comment I want to comment<br> Microblogging Recommended | today's hot microblogging (edit: SN028)<br>
DavidCadogan.ca Forums » DavidCadogan.ca
the cement bridge formally completed last year
(1 post)-
Posted 10 years ago #
Reply
You must log in to post.