The incident site has now shut down<br>Site person in charge, have been controlled, the accident is under further investigation<br> <br>Guangzhou Zengcheng Yongning Street, a crane at the construction site crane crashed the day before the accident occurred, killing three people dead and one seriously injured was sent to the hospital died.<br> <br>Yesterday,nike tn, the Express reporter arrived on the scene learned that the site has been suspended after the incident. According Zengcheng notify relevant authorities, the site person in charge, have been controlled, the accident is under further investigation.<br> <br>■ written: Express reporter Chen Haisheng intern Xu Min<br> <br>■ Photo: Express reporter Bi Zhiyi<br> <br>● witness said<br> <br> <br> <br>Bang workers that earthquake<br> <br>The accident site is located in Guangzhou Zengcheng Yongning Street. Wu is a concrete worker on site. He told the Express reporter, the day before yesterday at 12 am, other workers go back to work to eat lunch, and only a few of them on site concrete crane company workers and four workers in jobs.<br> <br>"At that time the company's crane construction workers in the administrative building, we hit the concrete floor in the dormitory behind them." Wu said, they suddenly heard a "bang" a loud noise, and then heard a "crackling" sound. "The voice was very loud, shocked us." Wu etc. when they came out, found the dusty ground.<br> <br>Wu said that when he was in front of the scene scared, crane jib length of the above has been broken,moncler sito ufficiale,http://store.shopping.yahoo.co.jp/ebest-dvd/0000001046080.html, some of which are also linked to the external walls of the dormitory is under construction. "Take a piece of scaffolding also destroyed." Wu said, when there are several laborers working in the basement, since the fall of the boom have penetrated the floor broken, few of them laborers from running out of the basement when it comes to running and shouting 'earthquake it! earthquakes it! "<br> <br>● Field horrors<br> <br> <br> <br>Three nearly four ten meters altitude falling<br> <br>According to the workers introduced, crane operation will generally choose to work after workers were using the time to increase unmanned crane for steel transportation. "They go to work more than 11 points, and 12 points on the accident." Worker Xiao Zhou said there are three workers was on the crane operations,http://www.shop-colour.net, including two in the middle position, an operator in the cab In addition, a worker in the underground linked job.<br> <br>"I do not know how it happened, the crane at an elevated process, suddenly lost his balance and weight distribution on the crane boom plus a few tons, and it would hit the opposite side of the floor, and then they fell down." Xiao Zhou said Fortunately, there was no crane construction workers below, otherwise the consequences could be disastrous.<br> <br>"It was three workers on the crane from nearly 40 meters high fell." Wang said workers, rescue workers arrived quickly on site, using the crane to crane formwork hanging walk, found in a pile of rubble an injured worker, and immediately taken to a nearby hospital. The other three workers died on the spot, it has been.<br> <br>● reporter visited<br> <br> <br> <br>After the tower crane broke apart steel<br> <br>At noon yesterday, the reporter went to the incident site, then the site closed the door, stand on the heights seen between the two buildings, falling crane parts scattered on the site, the scene is a mess, yet clean up. Tower, boom, cab ...... originally in the top part of the crane tower together,http://www.my122.com/?action-viewcomment-itemid-241241,scarpe hogan outlet, and now the boom east cross at the site,http://www.aurosiksha.org/login/index.php?item/create_form/1, the top body still hanging down the scaffolding around the other buildings on the south side of the building under construction . After the broken crane, tower top bars apart, there are obvious signs of fracture after extrusion.<br> <br>On the site,chaussures louboutin,http://store.shopping.yahoo.co.jp/waiwai/glx-6900-bgd-120.html, staff safety supervision department under investigation. According to the workers introduced the day before yesterday at noon after the incident, the site announced an emergency shutdown, but still no notice of when to return to work. "All I stopped, I heard you want a long time, someone is ready to return home." Many workers gathered outside the gate hovering accident waiting process ends.<br> <br>According to the workers,http://www.thomassankara.net/spip.php?article1065, it said the accident administration building originally planned to build 13 floors, has now built a 9-layer, about 40 meters high, while behind the administration building, is going to build a building of staff quarters, the entire expansion project planned in August can be completed in mid-now full suspension,http://119.29.37.14/index.php?action-viewcomment-type-news-itemid-350, workers said they did not know when it will be able to return to work.<br> <br>● Official Journal<br> <br> <br> <br>Police have control site person in charge<br> <br>Yesterday afternoon after 8:00,http://www.middleeast.org/read.cgi, Guangdong Province emergency Netcom reported, the day before yesterday afternoon in Guangzhou Zengcheng Sofia Division meters Kitchenware Co. a plant under construction collapsed together scaffolding accident occurred, causing the death of three workers (one person to the hospital 3:00 died). Cause of the accident is still under investigation.<br> <br>Yesterday afternoon, Zengcheng District Propaganda Department informed that, we understand that four of the deceased are: blue (male, 48 years old),canada goose homme, Wang (male, 30 years old), Zhang (male, 44 years old), a green ( male, aged 47). The site is the construction unit construction company in Chongqing clouds.<br> <br>After the accident, Zengcheng government and safety supervision, public security, construction and other related departments rushed to the scene to organize rescue work. Currently, the territorial government and relevant departments are going all-out to appease the families and rehabilitation work; the site person in charge has been controlled.<br><br>
DavidCadogan.ca Forums » DavidCadogan.ca
. Cause of the accident is still under investigation.
(1 post)-
Posted 10 years ago #
Reply
You must log in to post.