<p> May 21, 2014, Guangyuan Articles tanker commercial concrete company,hollister padova, once again hit the railway bridge in the same location. Poor railway bridge was hit twice a year. Hit the bridge over the past 49 days, the accident has yet to evacuate the tanker, along with a support under the bridge to be "imprisoned" in the busy downtown section, causing the road traffic disruption, the bus had to detour. Night Cement tanker hit the railway bridge Chengdu Business Daily reporter learned that this year on May 21 evening 8:20,hogan roma, Guangyuan Articles cement commercial concrete company in a large tanker, from Guangyuan violations through downtown bridge opening height limit of 3.5 meters. Accompanied by a loud noise and ground tremors, the Chengdu to Pakistan Pakistan Canton Railway overpass bridge was hit on the 1st, limited overhead was damaged,scarpe hogan, the damaged bottom bridge, part of the steel exposed, tanker was stuck in the bridge can not move. Liu received a driver alarm, police rushed to the scene after the accident tanker deflated successfully removed from the railway bridge. Identified by the traffic police department, Liu did not promptly and effectively to observe traffic signs, reckless driving misjudgment, inappropriate Threatened measures, in violation of the city truck traffic regulations,hogan donna, causing accidents.</p>
<p> and so far there is no pay,hogan prezzi, and the railway sector still lawsuit Parties say Concrete Company: Last year, did not agree on maintenance costs The tanker was they deducted After the incident,outlet hogan online italia, the tanker was "imprisoned" in the railway bridge. According to the Articles of commercial concrete company said the tanker was the railway sector "imprisoned" up.</p>
<p> should bear full responsibility for the accident. That night, the railway sector to bridge damage were examined by train to protect the safety of the railway infrastructure sleepers emergency dispatching personnel form the stent, the damaged part of the reinforcement. And notify the Service Depot, from where the train passes must slow down. The next morning,hogan donna, to iron safety supervision bureau staff and infrastructure and technical personnel, as well as road and bridge shop Guangyuan responsible officer arrived on the scene. After comprehensive testing,hogan outlet, to determine the accident did not affect the main structure, but the damaged bridge before making repairs to ensure safe passage of the train, you can not withdraw sleepers. Tanker accident "jailed" Downtown traffic disruption Guangyuan road blocks located south of the downtown area under the railway bridge opening was sealed three-quarters of the blue fence. According to the map display, connected to the blacksmith street corner south,sneakers hogan, eight important street sea trench Street,scarpe hogan scontate, Lee State Road, the roadway son, mother Lane, is out of the south to the business district of the Old City of Guangyuan important channel. According to the traffic police department measured data show that the first playing around blocks south,hogan spaccio, the average daily traffic of vehicles exceeded 40 motorcycles to reach at least 5,hogan sneakers donna,000 non-motorized motorcycles. After playing around.</p>
<p> since leaving passable bridge opening width of less than two meters,hogan, vehicles can not pass, the bus had to be diverted. Yesterday, the Chengdu Business Daily reporter on the scene saw a huge black inner fence sleeper hold up the bridge. This has been propped up sleepers railway bridge,sneakers hogan, is the Chengdu to Pakistan Railway, Guangyuan wide bar on the 1st Railway overpass. In addition to the sleepers inside the fence, there is a cement tanker, tank top scraped obvious traces. Traffic police car parked near the fence, lights stop flashing. According to Guangyuan City traffic police detachment directly under a team of police reports,hogan on line, the South Street railroad bridge from May 23 began playing around, and thereafter deployed six special police and the Police Association, responsible for the work of the intersection to ease peak period. But because located downtown traffic pressure is still very large. Reporters saw through here very crowded pedestrian and non-motorized. The hit Time: May 21 this year,hogan scontate, Injury: Limit overhead was damaged, the damaged bridge at the bottom Maintenance: knocked 49 days,hogan donna, the service has not carried out Progress: The railway authorities said the railway bridge had to be monitored, but the company has been outstanding mix Articles providers monitoring costs,hogan online outlet, reports have not got Last hit Time: May 20 last year, Injury: figure, was down the middle severing Maintenance: Maintenance costs for more than 100 million approved Progress: Concrete Company believes that the high maintenance costs.</p>
相关的主题文章:
- http://eye.catfood.jp/kousin5/apeboard_plus.cgi?command=read_message&msgnum=40/锟終enapa/
- http://www.hengji-ad.com/forum.php?mod=viewthread&tid=7033&fromuid=2486
- http://www.zhushanwang.cn/home.php?mod=space&uid=22550
- http://www.yunmingkeji.com/forum.php?mod=viewthread&tid=2840901
- http://121.40.97.173/forum.php?mod=viewthread&tid=1071658&fromuid=128291
- http://www.wushu.cc/home.php?mod=space&uid=4464
- http://www.infocrystal.com/alink/apeboard_plus.cgi?command=read_message&msgnum=620/
- http://bodahr.com/bbs/forum.php?mod=viewthread&tid=983314