<p> deferred investment 885 million yuan The total investment is controlled within the range of approved investments. Overall, the construction and operation of underground power station is better.First, the actual power generation capacity exceeded the design level. Underground power station designed annual average generating 3.511 billion kwh, by the left bank, right bank power plant units unified, 2012-2014 actual annual generating 4.255 billion kwh more than the design 21%; total sales revenue of 2.734 billion yuan to achieve power on Taxes paid 489 million yuan, net profit of 218 million yuan.The second is to improve the stability of the Three Gorges reservoir water power utilization and power generation operations. According to statistics,hogan outlet, the underground power station put into operation in 2014, the Three Gorges reservoir water power utilization from the original 93.1% gradually increased to 97.4%, which flood water power utilization from 90.6% to 96.5% increase. Meanwhile, the underground power station put into operation to increase the reserve capacity of the Three Gorges power plant maintenance and accidents, help to improve the stability of the Three Gorges power station unit operation.Third is to promote hydropower electromechanical equipment localization and innovation. In addition to import part of the underground power plant units and other components automation components, but have basically achieved the domestic design and manufacture of hydraulic turbine model runner design and other key technology has been fully home, the key material properties and other large units Forging reached the international advanced level.Second, the main audit findingsThe draft (a) Final Accounts of more dollars invested 33,785 yuan. 714,720 yuan investment for the completion of the financial statements listed in the draft.</p>
<p> (In the Ministry of Transport Discipline Inspection Group and Supervision Bureau) EdThree Gorges Dam underground power station completed draft financial statements audit results (September 10, 2015 Announcement)March 2015 to May,hogan scarpe uomo, the Audit Commission organized the draft Final Accounts Three Gorges Dam underground station (hereinafter referred to as the underground station) conducted an audit. Audit results now announced as follows:First,hogan interactive donna, the basic situationThree Gorges Project Construction Committee under the State Council in 1992 approved the overall plan, the Three Gorges Water Control Project dam power station installed in addition to 26 units, 6 units reserve the right bank underground power station. The six stand-alone units are 700 MW capacity, since February 2002 tailrace construction began, to 2012 5 menstrual acceptance,hogan bambini, all put into power generation, construction period is less than in the preliminary design of 22 months. Final Accounts of the draft report, the accounts reference date (31 May 2012) total investment 7.147 billion yuan, 2.186 billion yuan of which construction engineering,hogan shoes, installation engineering 361 million yuan, 3.715 billion yuan investment in equipment.</p>
<p>581,900 yuan. 2. Deferred investment 51.9483 million yuan, accounting for 5.87% of the draft accounts presented investment. First, the cost will be borne by other works of Three Gorges 17,scarpe hogan store,162,700 yuan accounted underground power station project,saldi hogan, resulting in more investment dollars accordingly; the second is over-standard pay supervision fees 17,hogan donna,327,hogan sneakers,800 yuan, the tender agent fees 4,528,900 yuan; three duplicate payments survey design fees and special research expenses 4,139,200 yuan; four multi-meter pipeline completion and settlement costs and other expenses 8.7897 million yuan.3. equipment investment 10,scarpe hogan,380,700 yuan, accounting for 0.28% of the draft accounts presented investment. Total budget for one more foreign investment in equipment 5,385,000 yuan; the second is reserved for equipment purchase contract balance due more than 1,516,300 yuan; three meter cable equipment 3,479,400 yuan of investment as unused.(Ii) equipment and materials procurement, construction, technical advisory services not according to the law the tender,hogan milano, involving 154 2717200 yuan contract amount. Such problems, the Audit Commission had on the China Three Gorges Corporation (hereinafter referred to as the Three Gorges Project Corporation) has repeatedly pointed out in the audit. But this audit still found the following problems: 1. Construction of the main civil works projects and some of the equipment and installation according to the specified public bidding, involving the contract amount 132,hogan outlet,012 yuan. 2. Material procurement cement, fly ash, steel and other Failing to open tender,hogan 2014, involving 16 contract amount 3.572 million yuan, of which 13 direct purchase 1,312,hogan interactive donna,000 yuan,hogan uomo, 32.26 million yuan to invite bidding unauthorized practice.3. There are nine equipment supervision, mechanical supervision.</p>
<p> after the audit and verification, Tiaojian 33,785 million (representing 4.73%); investment adjusted for the 680,hogan uomo,935 yuan. specific situation: 1. Construction and installation investment 27 5.521 million yuan, accounting for 10.82% presented the draft final accounts of the investment. First, the virtual meter engineering, monovalent or more beyond the contract with billing,hogan outlet, resulting in more dollars invested 41,856,200 yuan; the second is more reserved Finishing count 23 2,hogan,082,900 yuan investment; three concrete external sales revenue Failing write-downs of investment 1.</p>
相关的主题文章:
- http://mijessicajones.net/bbpress/profile.php?id=6165
- http://www.alpha23.xyz/news/html/?241807.html
- http://cand.qee.jp/link_p/apeboard_plus.cgi?command=viewres&target/;/
- http://www.chinapublicart.org/forum.php?mod=viewthread&tid=554417&fromuid=154529
- http://www.wifigx.com/forum.php?mod=spacecp&ac=blog&blogid=
- http://eye.catfood.jp/kousin5/apeboard_plus.cgi?command=read_/;/
- http://www.solarbp.cn/bbs/forum.php?mod=viewthread&tid=3458305&extra=
- http://www.solarbp.cn/bbs/forum.php?mod=viewthread&tid=3439028&extra=