DavidCadogan.ca Forums » DavidCadogan.ca

in addition to the after-effects caused by leaks

(1 post)
  • Started 10 years ago by fglksouIO2b1

  1. Question 1 differ second floor roof tilt ends 5 cm wide crack problem matrix cracking plaster broken finger Question 3 memory foam exposed fires<br>Located east Guangqumenwai wide canal homes Area C, D area is the Chongwen District of dilapidated housing to move back to the old project. After the April 2009 owners to stay and found the ceiling leaking, the walls of the whole piece of mesh may avulsion phenomenon (newspaper reported many times). That year, the construction side to carry out home repairs. Two years later, the owners reflect, plaster due to the leakage problem is no cure, triggered off the ground defection problems still exist. In addition,http://yinle.xuqiouwang.com/home.php?mod=space&uid=96076, the roof tilted floor fine lines, wall cracks and other problems caused by people's quality of housing and residential security concerns again. Yesterday, Dongcheng District, Municipal Construction Committee, said a month ago to visit the district hundreds of households, the existence of housing quality defects, and has instructed the construction side of the deadline to resolve.<br> <br> 【event】<br> <br>Plaster leaking out neighbor to court<br> <br>Recently, two home owners Drainage Housing leakage caused due to litigation.<br> <br>Yesterday, in Building 23, Unit 3,http://www.postyournipples.com, 16th floor Ma home, the living room ceiling with multiple cracks. Ms. Ma said, in February, the ceiling began to peel and dripping. She reflected to the property, the developer, that is caused by pipeline leaks upstairs. The property has not been resolved, and suggested that she sued. Recently, Ms. Ma would upstairs neighbor Wu court.<br> <br>"Is the quality of housing, why sue me?" Wu said, that leak flooded downstairs,woolrich outlet, he suggested Ms. Ma for property maintenance. Leaking underground pipes in the living room Wu, repair to dismantle part of the floor, Wu worry bear no losses. "Property, construction side and I did not talk about the loss of the problem." Wu said, can only wait for the court ruling.<br> <br>The day before yesterday, East Court staff to the community to understand the situation. Developers relevant responsible person said, will coordinate the construction side, according to housing maintenance regulations, with the courts.<br> <br>[Visits]<br> <br>"Leaking drain" sequelae<br> <br>Two years ago, just stay home Drainage multi-family housing leakage occurs, attracted media attention, the newspaper reported many times. Two years later, when the reporter visits a leaky house.<br> <br>Two days ago, the residents presented a dozen Zhang 2009 housing quality registration form,http://wwzr888.com/home.php?mod=space&uid=5864, where most of the problems of leakage. On that day, the reporter visited over 20 households, approximately two-thirds of residents that in 2009 the construction side did at home repaired, but the leakage problem still exists. Leak caused the wall to crack,scarpe hogan, peel, defection and other issues.<br> <br>Building 23, Unit 2, Ms. home side, the year before leaking in serious condition. Yesterday, while Ms. family bathroom roof still wet and has a crack, "the evening peak water, under the water to drip interface." Said Ms. edge, repaired two years ago, but did not solve the problem, find the maintenance unit, the other says it has warranty period, no longer to repair.<br> <br>Building 11, unit 15 layer 2 Ada family bathroom walls, leaking lead plaster off. "Afraid to take a bath at home, do not go underwater."<br> <br> statement<br> <br>Property is responsible for contacting the maintenance side<br> <br>Residential property manager surnamed Zhang, said in 2009 after complaints have been few leaks. Found leaking, the property will help owners contact maintenance unit maintenance. Housing cracks and other problems, is the construction side and the responsibility of the developer, the property is only responsible for community services.<br> <br>Party shall identify the responsibility of the construction site<br> <br>Staff said the construction side, if housing leaks responsibility belongs to the construction site must judge. Building waterproof warranty period is five years, during which leaks, the construction side impact on the renovation maintenance, they are responsible for recovery or one-time compensation.<br> <br>Developers warranty items can be resolved<br> <br>Residential developers, real estate companies warranty Xin Yang Chen said the project leader, Housing leakage and other problems have been resolved, other issues,http://www.hsi.pub/home.php?mod=space&uid=8170, Chen said that any regulations within the scope of the warranty, you can find developers to resolve.<br> <br>■ Q & A<br> <br>Yesterday, Dongcheng District Construction Committee Construction engineering quality supervision station responsible person for the wide canal homes to respond to questions.<br> <br>Why a new house there are many problems?<br> <br>Dongcheng District Construction Committee: wide canal project to move back to their homes belong dilapidated house,doudoune moncler femme, spend a lot of time in the resettlement phase, leading to shorten the construction period,http://www.zstapp.com/home.php?mod=space&uid=2011595, the project therefore flawed. Because there is no approval process for defects caused lived Construction Committee have been punished according to law. A month ago, the owners of the material submitted to the housing problem, the staff investigation by households, found that one-third of households have repairs and compensation, other questions focused on leaks, cracks, tile empty bone, etc. These defects do not affect the overall structure.<br> <br>Why you can have defects approval?<br> <br>Dongcheng District Construction Committee: Construction is a construction unit organization design, survey, construction and supervision units to participate completed. Completion and acceptance phase, construction units and supervision units into the household self-examination, supervision, and submit inspection reports, the District Construction Committee is responsible for review and oversee the construction process in the approval process of the parties is legitimate, whether qualified construction workers, etc., If all the files are not the problem, the project can be approved. Drainage homeland legal procedures.<br> <br>How to solve the existing problems?<br> <br>Dongcheng District Construction Committee: the construction side has been informed of the situation of the house in accordance with the deadline to start repairs. If the construction unit does not fulfill warranty obligations, District Construction Committee will be handled according to law. For the things that the people involved in the vital interests of government does not matter, the government will solve the problem according to law.<br> <br>■ Survey<br> <br>1 issue a difference at both ends of the roof incline 5 cm<br> <br>The district residents who reflect, in addition to the after-effects caused by leaks, house load-bearing walls, partition walls have cracks in varying degrees. In addition, there are residents that the presence of the exposed wall insulation,doudoune moncler pas cher, roof tilt housing and other issues.<br> <br>"High roof a head a head low, neighbors are laughing I live in the 'coffin house'." Building 23, Unit 2, a layer of Ms. Zhang said. In the south wall of the very fact that home a second bedroom, and repair an embedded closet, wood closet at the top of both sides of different heights, forming a right angle trapezoid lying.<br> <br>Owners measurements show that the left side of the south wall of 235 cm, right side 240 cm, height 5 cm. According to "Residential building codes," bedroom, living room ceiling height of not less than 2.40 m. Yesterday, Dongcheng District Construction Committee staff said that the situation is indeed very fact exceeded, the very fact may make repairs or compensation to developers.<br> <br>Question 2 floor crack crack wide body such as a finger<br> <br>Yesterday, in Building 23 on the south side, at the bottom of the wall building body has cracked,http://jooine.net/home.php?mod=space&uid=11139, red-tiled room has a crack wide enough to have a finger fracture visible on the surface of white foam particles. Reporter When finger into the crack, can cutout white foam. "Crack for a long time, and had seen someone to repair." Residents said Fung.<br> <br>In addition to the House of crack, a plurality of the district office for the property matching floor, there are cracks in the walls, in front of a cabin Building 23, room at the top from the middle split, both sides have nearly 1 inch of displacement.<br> <br>Question 3 foam exposed plaster damage deposit fires<br> <br>Two days ago, the corridor plaster multiple visible damage, breakage exposed foam insulation. Owners say that insulation flammable. Owners foam debris picked up, with a lighter to ignite immediately. "If someone threw a cigarette, it will be a wall of fire."<br> <br>On the external walls of the elevator next to Building 23, Unit 1, 24th floor, walls smashed two holes, which is filled with white foam, in a place yet to breach the owners on the walls of the keys to poke keys to plug into it. Owner Mr Fung said: "The wall is all foam, next to the power supply,doudoune moncler soldes,http://www.cssunday.com/thread-64253-1-1.html, once the short circuit,http://www.szsgjq.com/news/html/?9232.html, fire explosive."<br> <br>Edition written / reporter Jenny Liu Yao Yao edition photography / reporter Yang Jie<br> <br>Welcome to comment I want to comment<br> Microblogging Recommended | today's hot microblogging (edit: SN009)<br>

    Posted 10 years ago #

RSS feed for this topic

Reply

You must log in to post.