<p> the new school was officially started construction. Today,air jordan italia, more than three years later, how the new school construction progress? Reporters follow Kezong Ming to the new campus, the school's new site on the reporter saw several school buildings the main structure of the new school has been completed, there are two school buildings on the south side is being renovated, and in accordance with the planning and design of the campus,scarpe nike air max, school walls, apartment buildings,soldes louboutin, playgrounds and so has not yet started construction. Construction of a new elementary school in the district, as well as several buildings failed to complete the relocation work. In addition,veste barbour, according , the school's plumbing network were not currently started, "teaching the roof now be built up more than put up a skeleton." In addition, the reporter noted that the new school is similar to the "Canyon" terrain, something both sides are towering dirt slope. Kezong Ming, the "mountain slope has not yet planning process. Currently,louboutin pas cher, the school of road hardening,zanotti homme, green building, water and electricity network are not tender and started, when it can move into the new school we do not say." In fact,nike air max outlet, even though the new campus under construction, it is also facing the risk of downtime. Cole Hill Elementary School in the Development Department of Education reported in the report shows that the new school teaching building is being renovated, and in the end of the completion of these projects will be no new construction projects, "the school now faces the old school can not move, new Property may be abandoned school has been built and destroyed in the situation. " Sector response Three causes of slow construction and put into use when there is no specific timetable During the interview.</p>
<p> two 22-storey palatial estate already erected, many residents have been living in,louboutin soldes, and the new school when put into use so far inconclusive. Construction slow 3 years ago, we started a new school has been built only a few school buildings The school, as early as in 2005,outlet moncler, when Kohl Hill Elementary School moved into the temporary campus, then the government has promised Zone "as soon as possible also to build a new elementary school." However, the reporter from the relevant departments to get information,tn requin pas cher, Cole Hill Elementary School new campus construction project project project, after the Cole Hill School moved into temporary campus five years,air jordan milano, that is by the end of 2010, the development zone government promulgated the "Huangshi City Ke Seoul Cole Mountain Hill School construction project approved PYP "was formally approved. In early 2011.</p>
<p> many parents question: Why,louboutin pas cher, after nine years of using temporary campus,acheter louboutin, Cole Hill Primary School is still unable to move to the new school? March 25, the reporter went to the Yellowstone Development Zone Management Committee, deputy director in charge of education, said Qiu Jindong, took over the job only a week or so, the situation is not understood. Subsequently, the reporter contacted the deputy director of the CMC previously in charge of education Chen Xinsheng, Chen Xinsheng told reporters:. "Had also done a lot of work, originally planned to build three completed, but not yet completed." Xu Xing Staff Development Bureau is responsible for teaching, education infrastructure revealed before project approval, land acquisition, planning and other work took time. Chen Xinsheng told reporters that at present there is planning within the school buildings have not yet completed the demolition, "the school's playground,giuseppe zanotti, etc. therefore can not start." This is also one of the reasons for slow construction of new schools. Secondly.</p>
<p> education bureau, said: "For now, Cole Hill Elementary School new school building program does not have a specific timetable,air jordan donna, it is Hard to say what can be delivered when the new school.</p>
<p> the school building is facing financial pressures. Deputy Secretary for Education Development Bureau Wu Yunlong, education introduction,jordan air max, the original budget of 60 million yuan of schools has spent more than 5300 million. The whole school was completed around 20 million still need to put in, "and the scope of the zone there are a lot of dilapidated primary school in need of repair, need money, money is very tight." Third,abercrombie, changes in land use planning elementary school become another reason for the slow construction. Kezong Ming introduction, starting with land use planning in two primary areas later in Yellowstone. Subsequently, the plan change, the district built a large estate,nike tn, and land shifted to the east side elementary school, moved to the east and west are now high slope of "Gorge" at home. Wu Yunlong told reporters: "The school will certainly have to continue to build until it was completed." Staff teaching infrastructure.</p>
相关的主题文章:
- http://blog.clzg.cn/home.php?mod=spacecp&ac=blog&blogid=
- http://bbs.zhengshaochun.com/home.php?mod=space&uid=58288
- http://blog.clzg.cn/home.php?mod=spacecp&ac=blog&blogid=
- http://www.infocrystal.com/alink/apeboard_plus.cgi?command=read_message&msgnum=620/
- http://www.vsyule.com/forum.php?mod=viewthread&tid=1408256&extra=
- http://182.92.150.159/apps.php?q=diary&a=detail&did=96999&uid=8656
- http://29006666.com/bbs/thread-124255-1-1.html
- http://www.furscity.com/home.php?mod=space&uid=30995