DavidCadogan.ca Forums » DavidCadogan.ca

Xianyang traffic arteries

(1 post)
  • Started 10 years ago by f2cD2a77

  1. November 8, in the Weihe River crossbridge of "decapitation" at two sixty elderly also have to climb a ladder to board the 3-meter-high bridge. Xinhua News Agency reporter Xue Tianshe<br>"Decapitated" the ladder over two pedestrian bridge every day Weihe<br> <br>Located between Xi'an and Xianyang, pedestrian bridge is not much around the ladder a few dozen kilometers; "decapitation" Cause and corporate land acquisition compensation system differences<br> <br>Transverse Weihe Weihe River Bridge, also known as marsh, located between Xi'an and Xianyang City, Shaanxi Province, plans to invest 537 million yuan,piumini moncler, will become the connecting Xi'an,moncler outlet milano, Xianyang traffic arteries, can greatly shorten the travel time between the two places.<br> <br>Main bridge in August 2011 after the completion of the connection is still millet Road Economic Development Zone, Xi'an and marsh eight cross this side of the bridge interchange project has been on hold for more than two years,piumini moncler sito ufficiale, the bridge has become a "decapitation bridge", not only vehicle impassable pedestrians need the aid of a ladder to climb three meters tall bridge. According to Xinhua News Agency<br> <br>■ status quo<br> <br>Ladder to work ten minutes was ranked team<br> <br>8 at noon, the reporter went to the Weihe River Transverse "decapitation" of the Xi'an side. East and west sides of the bridge have a ladder, a ladder to the west, the east is a simple ladder. Just down the ladder Liu said, the ladder only recently installed,http://hhflcp.com/bbs/home.php?mod=space&uid=95128, before only the simple ladder, climb up the ladder to the rickety,http://www.gywhgs.com/home.php?mod=space&uid=45842, also fell through.<br> <br>Ms Lau said: "This road from across the river (Xianyang) over recently,http://123.59.33.253/forum/home.php?mod=space&uid=11354, was originally a convenient figure, the result has been bad repair this bridge in the east of the previous wooden ladder that location heap a slope, up and down the electric car this year. October said to return to work, put the shovel slope, which a few months we can climb the ladder. "<br> <br>Just 10 minutes,http://edu.iliema.com/forum.php?mod=viewthread&tid=16346&fromuid=6437, the reporter saw a dozen pedestrians on the bridge climb the ladder, many of them elderly, and even women carrying children.<br> <br>Small business in Xianyang Lee said, if not since gone, it is much more about several tens of kilometers. The two months he was here in Xi'an into the goods, put things on the first tricycle pulled under the bridge, with a rope hanging up after the Trustee away.<br> <br>"Hanging goods, hanging bicycles are a lot of fun to work here every day before it, climb the ladder had to line up rafts came ten minutes late is also not unusual." Daily commute should climb the ladder of said. " But even so, I do not want tens of kilometers long route around it. "<br> <br>Zhangquan Hu said, "is thinking about this bridge in 2011 can pass,tn reuqin pas cher, and I was selected in the marsh (Xi'an) to work here, I knew this bridge repair bad, you might as well choose a near little units."<br> <br>"Sleepy bridge" into the temporary "parking lot"<br> <br>Climb the bridge, it is a temporary "parking lot." Hundreds of bicycles, motorcycles, electric cars parked on the inside, there are many cars parked on both sides of the bridge. Master Liu said the custody of the vehicle, when many cars can be parked here stretches twelve meters, non-motorized vehicles can be parked three four hundred.<br> <br>"In Xi'an work and live in Xianyang, car and ride does not go, here we supposed to stop?" Zhang Yan said the car was locked, "One day pay 3 dollars, work again take the unit several colleagues are so."<br> <br>Zhang Yan said, Xianyang road connecting the bridge repaired early,http://zgjycbs.com.id39820.hklin1.doctoryun.net/bbs/forum.php?mod=viewthread&tid=3937, Xi'an here has been waiting for. "Bridges every day that had never been seen from 10 minutes to Xian Xianyang, shouting slogans for several years, said every year is nearing completion, but not in mid-movement."<br> <br>This reporter saw the bridge not only the main project has been completed, the fence, transit, street, sidewalk sale, only owe connect Xi'an side "decapitation."<br> <br>It is understood, it has been repaired Xianyang side to take the high road closure measures to prevent driver error limit on the bridge.<br> <br>■ response<br> <br>Construction side<br> <br>And strive to build next year in August<br> <br>According to sources, the Weihe River crossbridge of "decapitation" involving land claims, one kilometer marsh eight Shang Ji Wei River Road to cross the road construction plot involving five companies demolition, so they could not be completed because the two companies in which relocation slow progress of negotiations.<br> <br>CMC staff members of Xi'an Economic Development Zone said that this year the two companies have reached an agreement and Economic Development Zone, the project has officially restarted. Bridge construction side Gansu second installation of the company said, and strive to make the Weihe River in August next year crossbridge opened to traffic,http://inyuan.com/game/space.php?uid=241813&do=blog&id=26368, and people travel Recently due to construction apologize for the inconvenience caused.<br> <br>For the problem of the construction of the convenience channel,http://www.mdxhw.com/home.php?mod=space&uid=47328, Xi'an Economic and Technological Development Zone Municipal Engineering Administration official said, to see the people pass every day to climb the ladder, they are very worried. But the construction of the bridge approach Weihe transverse in progress, due to the construction of the bridge approach requires Weihe transverse concrete structure at the southern end of the bridge, completely exposed, it is still unable to build the convenience channel. In addition,http://verdamilio.info/org/spip.php?article906, from a security perspective, the presence of the district construction unit digging buried pipelines, necessary to close the construction site when actinomycetes, hope people around recently able to bypass.<br> <br>The official also said that after the end of the bridge approach works, without affecting the progress of the works,louboutin soldes femme, will be the first to build a sidewalk to facilitate the passage of the masses.<br> <br>(Original title: "decapitation" Weihe two pedestrian bridges over the ladder every day)<br> (Edit: SN064)<br>

    Posted 10 years ago #

RSS feed for this topic

Reply

You must log in to post.