<br>Motivation Survey<br> <br>To buy resettlement house, just decoration on wall cracks, water seepage and other quality problems. So, whether through housing project quality inspection before delivery? Construction quality meets the acceptance criteria? Housing quality supervision department of quality problems be interpreted? "Legal Daily" reporter visited the scene by the owners and quality supervision departments on the matter conducted a survey interview.<br> <br>□ Special Investigation<br> <br>Our reporter Wu Xiaofeng Xing Dongwei<br> <br>For several days, staying just Shoufang owners are not happy. Located in Qiongshan District,nike air max pas cher, Haikou City, Hainan Province, Xing apartment house, is the local government organizations buy resettlement house, you can just completed renovation, there a number of houses ceilings, floors crack seepage varying degrees, cement shed,http://www.4dictionary.com, bare steel and fire alarm against the door frame and so on. Housing tenants believe that "cutting corners" very worried about the quality and safety issues.<br> <br>"Legal Daily" reporter recently came to the resettlement housing community survey interview that the government Hing apartments have been qualified through quality inspection. It may be why there are so many houses still cracking the case? In this connection, Haikou construction engineering quality supervision station's deputy chief Wu Kunshun charge acceptance, said: "Acceptance is just procedures and forms, how can one by one checks", "This situation (cracking) is like people have a cold, you can not say people can not." "Construction Founder someone repair process, technically speaking, not only to fill the crack,peuterey uomo, but increased the main structure of life."<br> <br>"Upstairs Downstairs decoration like rain."<br> <br>"The newly renovated house just stay less than ten days,http://www.cwbao.cc/bbs/forum.php?mod=viewthread&tid=14839, living room, bedroom, kitchen ceilings are leaking cracks, so people really Zaoxin up." Fu Xing Apartment 505, Building B owners Guoqiang pointed to the living room ceiling cracked crevice say these two days, he and his family received only hotel room to rest.<br> <br>Wu Guoqiang home in the living room near the sofa on the left and on the ground, covered with a large snakeskin, ceiling cracks extending from the entrance to the bedroom door; seep down from the sixth floor of the ground water, the paint on the roof peeling paint, exposed cement.<br> <br>"This is when the owners renovated 605 rooms, and seepage of cement sand under water." Guoqiang said, how this quality house? Renovated upstairs downstairs as it rains. More than 500 households in the resettlement housing area, the majority of houses had cracks, seepage and other phenomena, as well as bare, exposed steel, rust stains birth. Although there are now mending leakage repair professionals, but always felt safe in this house lived.<br> <br>"I heard reporters to residential property interview, just send fill a layer of cement." D Building Room 2404 workers of the district under construction renovation, the owners Qiu pointed bedroom ceiling just make up a piece of cement dust where it says to only decoration found off room twenty-three cement, steel bare, exposed. "This house, home security does not know?"<br> <br>According to Qiu introduced their residential resettlement households are Zhu Yun Road, Great Road relocatees, sugar cane community was promised demolition Qiongshan district government organizations to help them build or buy housing placement, January 8 this year, is located in Tainan Fu Xing Zhongshan South Road apartment to the owners after the completion of delivery.<br> <br>"Slab cracking, leaking houses, reinforced bare, and the fire alarm owners blocked the door tight, do not know whether acceptance." Wu owners and other owners talking about, so many housing problems,woolrich parka, property and government town government posted a notice Statistical quality problems of housing, we all suspect that the developers "cut corners", just so many problems.<br> <br>The acceptance of the resettlement housing area<br> <br>Reporters in the House Hing apartments A, B, C, D, etc. Building Survey visited that building, there are few owners moved into new homes, but they share a common experience, is upstairs renovation, the family will have different degrees of cracks in the ceiling seepage . Reporters on the scene saw the construction team working on some of the leaking ceiling repair.<br> <br>On the walls of the House Hing apartment door side, a July 2010 posted "Haikou City Construction Project Planning After the grant of publicity" sign, shown above: Haikou prosperous construction unit Estates Limited, the project nature of land for two class residential land, with a total land area of 15,003.717 square meters, with a total area of 2,906.21 square meters,http://recit.cadre.qc.ca/~vision/spip.php?article9, the volume rate of 3.5, building density is 19.33%, green rate of 35.12%, reported that construction projects approved by the A, B, D Building of residential blocks, each built 26 floors, C built 13-storey residential buildings, E, F are commercial buildings,woolrich parka, were approved the construction of three-layer and layer.<br> <br>It is understood that the apartment in 2010 won the bid by the Nantong Construction Group, the same year on November 1 construction project started construction, utilities installation,http://www.parisiensautrement.com/spip.php?article41, completed in May 2012.<br> <br>Reporters in Haikou prosperous developer interview Investment Co., the company's staff to see the material provided by: Haikou Quality Supervision Station in apartment house Hing Construction Quality Supervision comments June 20, 2012 issued: "After construction reconnaissance units of the organization, the acceptance group design,barbour Soldes, supervision, construction and other units of the completion of the project design and construction quality contract the acceptance, acceptance conclusion: the construction quality of the project meet the eligibility criteria for Construction Quality Acceptance "<br> <br>At the same time, developers also presented to reporters taking the construction project completion and acceptance of civil air defense, fire inspection, environmental protection and acceptance.<br> <br>"How could so many properties for sale individually check"<br> <br>Now that the project has passed the quality inspection, why there will be so many quality problems?<br> <br>March 15, Haikou city construction engineering quality supervision station deputy stationmaster Wu Kunshun accept the "Legal Daily" reporter,http://www.tenipa.net/16/cgi-bin/memo/apeboard_plus.cgi?command=read_message&msgnum=10/, said, June 20, 2012, the government organization Hing apartment construction unit surveying,http://www.postyourasian.com, design, supervision, construction and other units inspection team composed of the acceptance of the project, the construction quality apartment house Hing Construction Quality Acceptance meets the eligibility criteria.<br> <br>"We as an official quality supervision department, but on their self-test procedures and checks carried out in the form of acceptance." Wu Kunshun said, Haikou Asking how can one by one so many checks it? As long as developers and building contractors when the organization's self-test unit, the information available, there is no problem in line with the standard line.<br> <br>When the time for acceptance, quality supervision sampling stations in the end the government Hing apartment number of households, claims not to know. "When the number of households and the acceptance of the sampling does not explicitly require the State only affordable housing requirement is 10% of the sampling rate, now Haikou City on affordable housing provision is implemented by households and acceptance." said Xing House apartments It was built according to newspaper and commercial acceptance.<br> <br>Fu Xing situation for apartment houses cracking occurs, said: "This is like a cold man, who can not say no, but must recognize the existence of the defect." From January 2013, when the construction side submitted to tenants for renovation, We have found the roof cracking, water seepage phenomenon, after the announcement, combined with the property companies and housing linkage examination revealed a total of 31 different cases cracking. Wherein the presence of seven different degrees of structural cracking, which is the main structure (floor) cracking; eight layers of cement mortar batch file empty bone cracking; 16 floors Buried layer cracking water pipes batch file. Cracking,http://www.bubu28.com/home.php?mod=space&uid=3305, leakage is a common problem in the construction of quality, there is a problem many factors, from the current domestic and international technical point of view, the quality of crack are from six months to three years in succession reflected, so that may not be able to detect problems in the final acceptance .<br> <br> also said, for the issues involved, the construction unit has developed a detailed maintenance measures, and report to the Institute and the supervision unit agreed to be implemented after the approval,http://tom-baessler.de/spip.php?article1, also reported that the quality supervision station record. There are currently 27 to be addressed, there are three being processed. Maintenance by the construction side, from a technical perspective, not only to fill the crack, but also increases the life of the main structure.<br> <br>For House Hing apartment final acceptance inspection, if found shoddy construction units and other acts in the construction process, Wu Kunshun did not respond positively.<br> <br>"District E, F is called external to the housing sales price of real estate, there is no one to reflect housing situation cracking." Owners of the district, said they suspected was housing because of A, B, C, D is at a lower price to sell resettlement households, while real estate prices will be higher than two or three times.<br> <br>Owners of the above statement, pending further investigation and verification.<br> <br>Newspaper Haikou on March 21 electricity<br> <br>(Original title: Why acceptance of resettlement housing cracking seepage)<br><br>
DavidCadogan.ca Forums » DavidCadogan.ca
exposed. "This house
(1 post)-
Posted 10 years ago #
Reply
You must log in to post.