It has been shut down half of the tunnel excavation site. Tang Yi Jin photo<br>Question one: outfall line discrepancy?<br> <br> solution:<br> <br>Project is Yuechi committee and government in 2014 identified key infrastructure investment projects, the construction route coincides with the route planning.<br> <br>Second question: whether the project no compensation policies and regulations?<br> <br> solution:<br> <br>Statistics from the Murakami himself occupied land area,http://www.harmers-int.com, and then review by the Water Authority, the bureau approved the compensation standards, and finally the county finance direct complement lose. Compensation standard signature confirmation by the villagers.<br> <br>July 22, there are people call the newspaper News Hotline 96111, reflecting Guang'an Yuechi Water, in the organization and implementation of the pharmaceutical industrial park sewage works, sewage pipes after tank factory kiln Jiulong village,http://www.noshironet.jp/bbs2/light.cgi?res=993%22, the villagers without covering It agreed to unauthorized construction, illegal operations, seriously affecting the housing safety and water security of the villagers.<br> <br>Whether the true situation of the masses? How the truth in the end? July 25, reporters visited the site Yuechi JIULONG kiln tank factory village and the County Water Authority, to investigate. The villagers broke the news: outfall toward implementation of the project questioned the discrepancy?<br> <br>It is reported that Yuechi medicine industrial park sewage works,http://lunatic.kill.jp/cgi-bin/link/apeboard_plus.cgi?command=viewres&/, is responsible for the county Water Authority, on April 7 started. The project proposed drainage ditch line, starting in Jiulong goose down Pa Tangjiayuanzi at ending Zhangjiaba River branch river left tread water for three villages,moncler outlet italia, a total length of 14.5803 km. Engineering take gravity mode, the sewage treatment plant tail water into three River,http://bbs.xjrckf.com/forum.php?mod=viewthread&tid=436&fromuid=89, and then import the Jialing River. The Jiulong village kiln pot plant construction plan precisely the point on the line.<br> <br>July 22, the village 3 village community Liu (a pseudonym) call the newspaper, reflecting the many irregularities that exist in the case of this project. Subsequently, reporters connect the villagers to learn more about the situation.<br> <br>According to Liu reflected Yuechi Water Authority in the process of organizing project implementation, the outfall route to differ with the planning, implementation of the project has been questioned the legitimacy of the villagers. And without the consent of the villagers will take up farmland, for example landfill wells, toilets and other facilities, but not compensation policies and regulations.<br> <br>How truth? Afterward, the reporter visited one by one kiln JIULONG tank factory village, Yuechi Water, etc.,http://www.berry-blue.com, to restore the truth.<br> <br>July 25, the reporter went to the village of Jiulong kiln pot plant. 3 in the village community project construction site, the reporter saw a tunnel dug half has been suspended, not far from a dozen casual workers sitting under a tree Tanabe. It is reported that the project due to kiln pot plant villagers blocked and forced to shut down.<br> <br>County Water Authority: The emission reached drinking water standards, there will be no security problem<br> <br>Subsequently, the reporter learned that the villagers reflected on "outfall route to discrepancies with the planning,nike air max 90," "without the consent of farmland will be occupied, but not compensation policies and regulations" and other issues, the reporter conducted a survey has been parties confirmation.<br> <br>Reporters learned from the County Water Authority, and planning for the outfall route to differ, challenged the legality of the project implementation matter, County Water Authority presented Yuechi Development and Reform Bureau,nike tn pas cher, "Economic and Technological Development Zone on Yuechi Reply Notice "South Industrial Park sewage treatment plant project feasibility report. After verification, the project is Yuechi committee and government in 2014 identified key infrastructure investment projects, the construction route coincides with the route planning.<br> <br>However, the villagers fear the pipeline on discharge of sewage from their own homes through, can contaminate drinking water problems, County Water Authority replied Industrial Park sewage treatment plant and wetland purification of drinking water has reached the three types of water emissions standards A level, will not bring safe drinking water problems<br> <br>See records of members of the General Assembly meeting reporters in the kiln tank factory village held, in addition to elected representatives, as well as the staff of the participants County Water Authority. At the meeting, participants raised include how to protect the masses of water after the start,http://libertad.fciencias.unam.mx/spip.php?article3675, allowing the villagers to the construction site unskilled laborer, etc., playing 13 questions and comments. Water Yin Bin staff on these issues individually.<br> <br>In Jiulong Town Government, the people responsible for the project coordination of town Party committee members were born Jiang told reporters that the project related to all land occupied and young crops compensation, in accordance with "Guangfu Ban Fa [2013] No. 12" documents The standard compensation,http://nade-khad-civi.seesaa.net, first Murakami own statistics occupied land area,moncler pas cher, and then reviewed by the Water Authority, the bureau approved the compensation standards, and finally the county finance direct complement lose. Compensation standard signature confirmation by the villagers.<br> <br> progress:<br> <br> <br> <br>Project is still suspended, will make project safety assessment<br> <br>Jiulong village kiln pot plant for three clubs tunnel project to stop construction issue,piumini moncler, the government and the Jiulong County Water Authority was working towards an early resumption of construction. Chief engineer Zhang Rongjiang County Water Authority said it was contact PLA Logistics Engineering Test Center,http://sori.org/hangul/conv2kr.cgi, requesting tissue engineering personnel to the scene, do project safety assessment, issued in accordance with the identification results of this tunnel is safe pipeline project identification book. If the identification results show safety, it will make the villagers work together so that the project completed on time; if the results show that it is safe to re-plan the pipeline route.<br> <br>"The villagers fear is justified, our staff will continue to work to eliminate all concerns, strive for an early re-started." Zhang Rongqiang told reporters that the project take segmented construction approach, currently JIULONG kiln pot plant Village lockout lockout has been two weeks, hundreds of meters behind the other section, after the re-start speed up the progress, so as not to delay the overall schedule.<br> <br>West City Reading trainee reporter Tang Yi Jin<br> <br>(Original title: Worried medicine sewage villagers pulled over county key projects)<br> (Edit: SN146)<br>
DavidCadogan.ca Forums » DavidCadogan.ca
" "without the consent of farmland will be occupied
(1 post)-
Posted 10 years ago #
Reply
You must log in to post.