<p> which is the Navy Equipment Research Institute,tn pas chere, this organization is not under the Armament Department of the Navy,air max mujer, the Navy is the advisory body organs. Content argument mainly operational requirements analysis, necessity analysis, technical feasibility, operational performance analysis,air jordan shop, missions and tasks and operational use analysis, models of the main operational performance requirements, the initial overall program, program comparison, the combat capability of analysis, security conditions,air max pas cher, development cycle, proposed budget, conclusions and recommendations, and so on, and finally form a comprehensive demonstration project report into the project stage. Then the work is to develop phases: the initial program design and deepen the design.</p>
<p> By the end of December 2013, Liaoning ship aircraft carrier to move into the South China Sea to conduct scientific research and testing and training, it is learned,air max outlet, in the South China Sea has accumulated more than 100 trials and training courses, combat systems,woolrich prezzi, power systems and naval warfare technology airworthiness performance and other indicators have been further verification. In training, Liaoning aircraft carrier and multi-type surface ships and submarines large submarine fleet. The 052D selected first ship in the South China Sea Fleet deployment in the future whether it will join the ranks of aircraft carrier battle groups in the fight? To answer these questions, we had to start from the development process of China's naval equipment. The basic flow of military equipment in accordance with the development of our country, are generally the following procedure: pre-research,zanotti femme, development, equipment,nike shox outlet, and assessment. As for the quality of equipment problems.</p>
<p> it was suggested that such a view,chaussures femme pas cher, for the development of new weaponry and better ideas should be pre-research,air max baratas, development, trial modification. That is, there must be a force to try and feedback process, allowing users to also be involved in equipment development and plays an important influence. Let's look at 052D of the first ship in service, a view that the ship enter service so quickly, does not mean that the state is not complete enter service in advance. On the contrary, this approach can be leading navigation equipment the opportunity to test the first ship rests in the hands of the user.</p>
<p> if applicable, to a large extent in the pre-specified research and development of indicators and technical parameters to guarantee. Once the weapons and equipment, the possibility of big changes do little. Therefore,moncler donna, in this process,parajumpers femme, the pre-feasibility study and develop particularly important. In the pre-feasibility study stage, and probably divided into demand, research, feasibility studies, design several stages. Define a new model,air jordan donna, the first is that there needs, and source of demand is generally based on two aspects, one is the top-down, put forward by the high-level, high-level starting point demands put forward is generally based on the country's political and military strategies required consider. The other is to the next and on the demand put forward by the combat troops, that is, the consumer. Go directly to the first line of research is the use of force to listen to opinions and suggestions, any member of the research group is very extensive, including related equipment unit of the PLA personnel, personnel design, people demonstrate institutions, invited the military and civilian experts and the like. After the research program is the demonstration phase,christian louboutin pas cher, carried out by the military argument agency.</p>
<p> issued a research task of the book,nike air jordan, the preliminary technical design, deepening the technical design and so on. Wherein each node must be reviewed and reviewed,2014 Scarpe Hogan, if not through the review, it can not enter the next step. In all aspects of the review, the troops were involved as moderators,hogan outlet online, can put forward their views and daily use from operational use aspects were examined party must be raised by the implementation of the review comments. We can say that in the whole process of ship models developed using troops opinions are respected and implemented. The next step is construction work to build the factory, the main factory of the process is completed. For ships, the troops involved in the trials work more after construction completion. Test, trial process during the full participation of armed forces, have the right to put forward their opinions and suggestions by the military to make a determination on behalf of the trial results. But in this process.</p>
<p> the main work force familiar with the operation or use of equipment, training institutions shipyard operation using troops were practical operation of training and assessment, the practical operation of those who did not pass the examination can not obtain a certificate, it means you can not posts, These are the Navy,nike air force, "then ship work regulations" clearly defined. In trial operation, troops more to learn, rather than testing. Trial work is mainly dominated by subcontracting the industrial sector, some of the problems a lot of details on weapons and equipment, mostly after the armed forces gradually discovered. Therefore.</p>
相关的主题文章:
- http://www.usedtel.com/forum.php?mod=viewthread&tid=2340&fromuid=184
- http://xf.subdns100.com/forum.php?mod=viewthread&tid=28103&fromuid=7148
- http://kujiraduki.fakefur.jp/p-nikki/apeboard_plus.cgi/apeboardp_mt.cgi/
- http://bbs.2jr.biz/forum.php?mod=viewthread&tid=1171202
- http://tkxl.net/bbs/home.php?mod=space&uid=6062
- http://bbs2.lyali.cn/forum.php?mod=viewthread&tid=350203
- http://www.175001.com/bbs/forum.php?mod=viewthread&tid=1575599&fromuid=16924
- http://211.86.128.2/gjjl/Review.asp?NewsID=595