Due to the long lay-off, a furnished house has rotten deformation.<br>Text / Nanfang Daily reporter Song Jihua<br> <br>Poet Hai Zi had sea life with poetic description --- spring blossoms. Hailing Island of Yangjiang Yoshimasa people lived off the sea, he owns a house facing the sea, in the prestigious zhapo bighorn Bay Beach. However, Yoshimasa had no time off feel love spring mood, but is Chouchangbaijie: He built a house loans plus Construction Bureau has been asked to shut down more than a year, he raised the administrative reconsideration has been slow to respond. Now he has nearly 10 million of debt pressure on the body, each month to repay bank interest nearly 8 million, has been renovated good house all moldy, water seepage, more than 100 million renovation costs completely wasted.<br> <br>■ Social Watch<br> <br>Seaside new house into a rotten room<br> <br>Off Hailing Island residents Yoshimasa as native,scarpe hogan, he has been engaged in individual business in the tourist industry Hailing Island, in Hailing Island zhapo Tengen building construction Lau is a dream of his career. October 2001 approved the construction of off Yoshimasa Tengen Building West Wing,nike tn pas cher, was due to limited funding, only built two layers, after put into use, operating efficiency is good. Then shut Yoshimasa and apply additions, Hailing Island Economic Development Experimental Zone Construction Bureau on 27 February 2009 formally approved on the basis of the original plus two 6-layer construction, and to shut Yoshimasa issued a "construction project planning license certificate".<br> <br>What, after more than two months early in May, when Yoshimasa run off bank loans, the building site is Tengen stepping up construction time, but the Bureau of Hailing Island off Yoshimasa lockout notice and issue a suspension notice on May 13 , the notice said, "because the adjacent user objection, in accordance with the relevant regulations, the need to coordinate treatment, hope you the date of receipt of this notice to suspend construction until after the mediation notice."<br> <br>Off Yoshimasa told reporters in the West Wing throughout Tengen approved the construction of public buildings and construction process,http://www.hongzhaopai.com/home.php?mod=spacecp&ac=blog&blogid=, he has not heard any objections, and no one talked to him talk about this issue. Construction Bureau to notify him by surprise.<br> <br>Hailing Island Economic Development Experimental Zone Construction Bureau, told reporters that the announcement Construction Bureau had approved the construction of just bulletin boards in the Construction Bureau of publicity, there is no publicity in the vicinity of the construction site, then Tengen Building West Wing adjacent property dispute, they must acting by chapter.<br> <br>Reporters on the scene, and off Yoshimasa downtime is two old house adjacent to the villa, the villa is close to the land red line, off Yoshimasa stoppage house is also close to the land red line, the two sides do not give. We understand that, as early as a year ago, Yangjiang, a well-known local private enterprises will be big old villa and all adjacent property acquisition.<br> <br>October 15, 2009, Construction Bureau issued a "construction project planning permit revocation decision," said a written decision has been issued by the West Wing of Tengen building "construction permit" in violation of the review process, "People's Republic of China Administrative Licensing Law "Article 36, the provisions of Article 47, decided to withdraw the already issued the" construction permit. " Off Yoshimasa plus built dream stop there,http://mtbclubminato.cocolog-nifty.com, the house has been built in a fixed four.<br> <br>At the site,http://aquas-html.com, the reporter saw more than a year since the lockout has previously additions of three, four have begun to rust rot in the sea erosion. And already built and put into use a two-story 1300 square meters of the house has also been added to the construction of some rainwater infiltration from the ceiling to the walls, mildew indiscriminately extending this fantastic sea views of the seaside hotel into of a bad room.<br> <br>Administrative license who should bear the consequences of bad,http://www.democratie-socialisme.org/spip.php?article3502?<br> <br>Hailing Construction Bureau issued a "construction project planning permit revocation decision" on the same day, and then issued a "notice of self-demolition." Off Yoshimasa certainly satisfied: had approved the construction of additions is your office, now requires the removal of half built or you Construction Bureau, the administrative licensing How can such inconsistencies, who is going to compensate their losses?<br> <br>October 27, 2009, hearing of the application in accordance with customs Yoshimasa, Construction Bureau. Off Yoshimasa suggested that "self-demolition notice" allegedly made according to "People's Republic of China Urban and Rural Planning Law" Article 64 stipulates that "the Town and Country Planning Act,woolrich outlet," Article 64 states: "without obtaining construction project planning permit or not in accordance with provisions of the construction project planning permit for construction by the local people's governments above the county level of urban and rural planning departments ordered to stop construction; still take corrective measures to eliminate the impact of the implementation of the plan, within a time limit, five percent of the construction cost a fine of more than ten percent less; unable to take corrective measures to eliminate the impact of, dismantle, can not be removed, or the illegal income confiscated, and may impose a fine of ten percent of the construction project cost less "and Tengen Building West Wing. Construction is to obtain a "construction project planning license", of course, this provision can not be processed in the construction bureau of "self-demolition notice" no legal basis.<br> <br>The Building and Construction Authority is represented at the hearing, she agreed administrative license (referring issued a "construction project planning permit"), when the presence of bugs, but in the window of the Construction Bureau of announcement of the publicity, there is no publicity at the construction site, and now someone to the complaint,woolrich outlet, the planning permit is a violation of procedure. Illegal procedure then the license must be revoked.<br> <br>Off Yoshimasa said that publicity is a matter of how the executive, improper if the public should be the executive compensation, rather than requiring that the executive Licensee own responsibility. Since Lau Tengen building projects are "construction project planning permit," construction is legal, how can demolitions?<br> <br>Off Yoshimasa told reporters, according to "Guangdong Province Administrative Punishment Hearing Procedure Implementation Measures" Article 34 stipulates: "In addition to postpone the hearing, suspend the hearing, the hearing shall be made within 30 days after the end of the hearing of the parties." But he was at the hearing After the hearing has not been informed about the results.<br> <br>Repeated overdue administrative review<br> <br>December 13, 2009, off Yoshimasa ED Hailing Island Economic Development Experimental Zone on the "construction project planning permit revocation decision" filed an administrative reconsideration Development Experimental Zone Administrative Committee designated legal bureau accepted.<br> <br>"People's Republic of China on Administrative Reconsideration" Article 31 states: made within sixty days from the date the administrative reconsideration decision, "the administrative reconsideration organ shall accept the application; however,http://hyougosoap.s102.xrea.com/cgi/j/j.cgi, the law of administrative reconsideration period of less than 60 days,http://store.shopping.yahoo.co.jp/ebest-dvd/0000001129668.html, except case. complex and can not make an administrative reconsideration decision within the prescribed time limit, by the person in charge of the administrative reconsideration organ may approve an proper extension and inform the applicant and the respondent; however, the most extended period not exceeding thirty days "off Yoshimasa wait. A few months, still no results of administrative review. Off Yoshimasa struggled to live consciously as ants on a hot pan,http://sh.caxa.com/bbs/showtopic-2618334.aspx, here reminders Construction Bureau, there reminder legal bureau, and two administrative departments, but not at all anxious.<br> <br>In Hailing Island Construction Bureau, deputy director Liang reporters interviewed. Deputy director Liang said that the construction bureau had recommended Yoshimasa off with his neighbors complained negotiated settlement, but both claim the gap is too big, not negotiated. Now that the stage went for administrative reconsideration,http://gr8c.org, construction bureau also had to wait for the results of the legal office of reconsideration, as the reconsideration time overdue, is not beyond the control of the construction bureau.<br> <br>Hailing Island Legal Bureau Director Chen said that the conclusions of the administrative review in fact already come out, the program has been completed, the reason overdue hope the parties to coordinate and solve problems. Results of administrative review of the parties is not necessarily desirable, they would be difficult to accept. Whether it is the government or the business person,piumini woolrich sito ufficiale, should be in local development, harmony and stability is the first.<br> <br>After a recent interview with reporters, Construction Bureau leaders said positive and off Yoshimasa consultations hope Off Yoshimasa accept the current two-tier scale construction has been added, to abandon the original plan plus 6 layers built to solve the problem. Off Yoshimasa has proposed, this result can not be remedied his huge losses, one is debt banks are unable to return. Off Yoshimasa still looking forward to the early publication of the results of the administrative review, what kind of results he is prepared to accept.<br><br>
DavidCadogan.ca Forums » DavidCadogan.ca
VD31X16J1F
(1 post)-
Posted 10 years ago #
Reply
You must log in to post.