<br>Yesterday 7:30 Xu, under provincial capital including the River Road Elevated Road through the bridge across the bustling length under construction "Bailey beam" dangerous occurrence,piumini moncler, weighing nearly 300 tonnes of "Bailey beam" tilts, heavy steel Liang Zhaodong serious side against the failure. Reporters investigation that led to more than a dozen workers when tilted in the beam construction by the surprise is not small, six people went to the hospital for treatment, three people have been hospitalized and one arm because comminuted require surgery. The official release said that this is the normal destructive testing.<br> <br>Ma Qin Qin Zhang Min Liu Chee Tsui reporters sweet / text yellow ocean / map<br> <br>Sudden danger: as avalanche-like beam tilt<br> <br>When reporters entered the construction site and found that the normal construction site is in full swing, the occurrence of a dangerous situation, "Bailey beam" is part of it across the busy road through the bridge at the north and south longitudinal beam, both frame pieces assembled Bailey Truss Liang made between multiple windows in the connecting member, secured by bolts.<br> <br>Reporters witnessed the monster-like beam tilt toward the skew in the east side, between the cut-off beam if a large gap can drill tolerating freedom. Since the tilt and was like an avalanche crashing against the failure,http://www.cannixabura.com/forum.php?mod=viewthread&tid=16114&fromuid=4326, in part by squeezing Bailey has been severely deformed. In the side of the beam,http://www.5636.com/bbs/home.php?mod=space&uid=244469, a large crane will be tungsten are decent turns on slowly Shi Liang crane, placed on the ground. But the reporter was informed that the beam after more than 20 days of intense construction worker, was in the 4th successful closure, post-closure do not want, the next day inclined dangerous situation, which led to more than twenty days of hard workers boondoggle.<br> <br>The incident was: more than a dozen people are screwing the bolt inside the beam<br> <br>Informed source, the beam tilt turn against the failure occurs, the process is almost instant, without warning. According to the workers when described, beam tilt on the buckle near the ground, even with a loud crash in the ground while jitter, the scene is extremely dangerous.<br> <br>"It was in the beam of a dozen workers within the construction, mainly tighten the bolts to secure the beam." One of the witnesses said this guard, tilt after the incident, one after another, there are many workers from the cracks in drilled,louboutin femme, it has scared breathing heavily, after which the workers together and began to count personnel.<br> <br>Hospital Interview: three people admitted to hospital to treat a fracture<br> <br>Subsequently, the reporter went to Hefei Friendship Hospital. According to the emergency department physician Jane Lee introduced the morning really treated several injured workers are squeezed, people have been discharged from hospital observation, but three people have been hospitalized for treatment, "one of them fractures, is surgery."<br> <br>On the 5th floor surgical ward, the reporter found two injured and hospitalized wounded, Xu Xiaolei Zhu Zhiqiang due to different degrees and abrasions, has received infusion therapy. According to the attending doctors, two of them is not heavy, but all reflect an abnormal condition of dizziness and vomiting. And another teacher named Zhou Wu from Suqian squeeze due to injury, resulting in right elbow at fracture, is currently being surgically implanted plate for treatment. Premier Lee introduced the hospital after receiving the person in charge of the construction side wounded phone call, the hospital sent an ambulance went to place, and the site has been arranged centrally van injured taken to hospital on the way, culminating in Ma On Shan Road Viaduct successful transfer of these wounded.<br> <br>Official release: This is a normal destructive testing<br> <br>11:00, the city bureau and focus on another site person in charge to reporters about the situation. Hefei emphasis Bureau Pack River Road Viaduct Project leader Jiang Hao said that from now, the beret tilted beam belong to a normal destructive testing. According to its introduction, the Pack River Road Viaduct Bailey bridge girder wear during overload pre-press test at the second cross-linking bustling avenue, synchronous collect relevant technical specifications.<br> <br>This cut bailey beam span 38 meters long, weighing hundreds of tons, according to the test stone reporters face the issue described, Jiang Hao made the following explanation, "test stone blocks weighing 2.5 tons each, a total of piling on the beam more than a dozen pieces, weighing nearly 15 tons, stacking purpose is to measure the capacity of the beam, piling rocks tests on site are very common, and is a must in the process of construction. "<br> <br>Yesterday,http://237.newfine.net/home.php?mod=spacecp&ac=blog&blogid=, reporters learned from the Information Office of the city government, including the River Avenue viaduct "collapse" accident, the Department of Engineering Test. The test is scheduled in the most unfavorable conditions were, after the pre-tilt bracket occurs when pressure for this test case, the data collected will be analyzed and summarized in order to ensure project quality and safety are not affected. Preloading test for the bridge construction process must step test is normal. In overload pre-press test, a person accidentally scratched, and two others hospitalized for shock felt unwell observation.<br> <br>Reporters Survey: suspected and tests related to the uneven stones of the point<br> <br>Zhang Jiaxiang,http://www.fcperivegauche31.org/spip.php?article96, deputy director of Bureau of Hefei focus to reports, the reason may be related to the tilt test is wrong about the stone pile. "Because of the lot environment is more complex, bustling Avenue bridge is the next bridge wear, during the test, it is necessary to build a load-bearing point, but is actually relatively long span beam."<br> <br>"In the process of laying stones test, because they belong to the mechanical construction, which may be asymmetrical stacked stones, resulting in stress points is too concentrated,moncler outlet milano, we can not guarantee that the balance beam is applied to the pressure, resulting in the bracket tilt occurs when preloading."<br> <br>Preloading test for the bridge construction process must step test is normal. According to the staff,http://games.zynews.com/forum.php?mod=viewthread&tid=1083032, it said the construction side, the section of beam selection bailey beam assumption is that given the complexity of the environment, "the other beam are based on Scaffolding."<br> <br>It is understood that in the Pack River Road viaduct construction project, a total of 39 similar beam-linked, but it is skewed construction projects last beam length,http://www.ningmenglt.cc/forum.php?mod=viewthread&tid=1183414, also the last overload pre-press test,http://www2.lineage88.com/forum/forum.php?mod=viewthread&tid=17740, had never happened So the situation.<br> <br>Question 1: Why preload test has more than workers in the construction?<br> <br>After escaped and the wounded to repeat, all agreed that, although heard of pre-press test, but a normal day there are more than a dozen construction workers in the beam within, their mission is simple: tighten the bolts, thereby fixing "Bailey beam" .<br> <br>Giant test stones at night already stacked in the beam, then this has been identified as destructive test, why there will be workers' desperate "rush to work every day, is the negligence or construction side did not realize test After ending?<br> <br>Question 2: The real victim was only to clarify the number of them eventually?<br> <br>Initially obviously represents only "one worker inadvertently crossing galling", no serious injuries,doudoune moncler soldes,http://www.postyourflasher.com, have returned to the residence, which is also used as raw material in the morning the project issued by the Ministry. Why press conference follow it to find three of the wounded in the hospital, one of them seriously, in these cases were eventually reported to clarify the material, "one person accidentally scratched, and two others hospitalized for shock does not feel observed."<br> <br>The real figure even injured staff initially focused on the publication of the Board were unaware of the incident, number of injured is the construction side deliberately concealed or a novelty? The ultimate focus of Bureau said the number of injured also on the construction side and further investigation and verification.<br> <br>Question 3: Viaduct opened to traffic the date will be delayed?<br> <br>This time the "destructive testing" has led to the original bailey beam has ended, will arrange to carry out redevelopment, so a delay is bound to delay a lot of time, including the River Road Viaduct opened to traffic the date will be delayed?<br> <br>It focuses bureau reports,scarpe hogan, the incident belongs among the schedule, everything is within a predetermined period, the plans for the reconstruction immediately after to be demolished, "will be pre-pressure test, the next step to ensure that overhead pouring concrete box girder construction safety. "<br> <br> Share: welcome to comment I want to comment<br> Microblogging Recommended | today's hot microblogging (edit: SN056)<br>
DavidCadogan.ca Forums » DavidCadogan.ca
one of them seriously
(1 post)-
Posted 10 years ago #
Reply
You must log in to post.