DavidCadogan.ca Forums » DavidCadogan.ca

it is estimated that construction of the bad years."

(1 post)
  • Started 10 years ago by fg2SfA8aSad

  1. At this campus reading a four-year old children and their parents look forward to be able to move back to the original school early, to learn in a new environment. Nanfang Daily reporter Yan Kunlun photo<br>Original title: Unfinished Transformation four years when the children return to their own schools?<br> <br>Nanfang Daily (Reporter / intern Kunlun Yan / Xu Lele Yang Xiaolin) four years ago, south of Road Primary School because of building reconstruction transformation seismic tests fail, students are forced to move elsewhere. Today, four years later, the school has not yet completed the transformation. Parents complain constantly, the school has repeatedly promised but never able to honor,hogan outlet, when teachers and students to "go home"?<br> <br>Children moved to "Guangzhou Paper Workers school" where dilapidated school buildings<br> <br>Yesterday, Haizhu District, Ho citizen complained to the Nanfang Daily reporter, his primary school children in the south of the road, in 2008 due to the seismic testing substandard teaching building of the school was forced to transform. The whole school students are moved to one kilometer away from the original primary school staff school wide paper.<br> <br>Ho said that after the school moved here and found conditions here very poor. But four years later, south of Road Primary School's original campus has not yet built, his children now almost graduated, but still can not go back. Many parents have repeatedly reflect the situation to the school, but the school has repeatedly shirk.<br> <br>Yesterday afternoon, the reporter went to the Haizhu District of Guangzhou Paper North Road, south of Road Primary School, just in time for the students after school time. This reporter saw the door of the school is on the wall that says "Guangzhou Paper Workers school" a few characters,http://www.xn--uisr00ceul.com/news/html/?176609.html, south of Road Primary School next to the hanging of the brand, which has been shedding some fonts.<br> <br>Reporter identity of parents into the school to visit, found the middle school building is only a 7-storey teaching building, facades have been very old. In addition to the campus of a small basketball court, no other sports venues.<br> <br>Inside school buildings, the majority of the facilities are old, stairway Road stacked with some broken furniture and other debris, and some classroom door broke a big hole. Reporters found that the entire teaching building only the third layer and the fifth layer toilet, there is no lighting, dark. In the teaching building, the reporter did not find fire-fighting equipment.<br> <br>Xiaoli (a pseudonym) is a road south of fifth-grade student, she told reporters, only a dozen school computer, not on a semester a few rooms. "Every time the computer class, several students are teachers in every class extraction go on." When a reporter and Xiaoli talk about things when migrating school year,moncler outlet italia, Xiao Li has lost count of the original school is what looks like a . But Xiaoli said she hopes to soon move back to learn in a new environment.<br> <br>A pick-up the child's parents told reporters, according to his understanding, Campus currently located Guangzhou Paper is the original school staff dormitory. "4 years ago, said to be temporarily relocated,http://net.gzcgkj.com/84189/news/html/?162160.html, each opening move parents say next year, but year after year passed, and next year in the end is what year? We parents are tired!"<br> <br>Earlier this year it commenced, completed during the year hopeless<br> <br>Reporter then went to the old school site south of Road Primary School, I saw the school closed the door, door hanging "under construction" sign. Reporters saw the residents upstairs next to the school building principal has been built, but not yet facades Qi Hao, side of the building is an open space, piled on top of many materials, there are several workers busy.<br> <br>According to nearby residents said, there has been demolished several years, the middle stop for a long time,http://www.komagome.info, there has been no movement, "began early this year to start, it is estimated that construction of the bad years."<br> <br>Reporters then call the south of Road Primary School, moved back to the time of their inquiry,tn reuqin pas cher,http://verdamilio.info/org/spip.php?article1321/, the school said the old campus a built immediately move back to, when a reporter asked why taking so long has not yet completed the reasons, the other party hangs up the phone directly.<br> <br>Haizhu District Board of Education Infrastructure Division related personnel,piumini woolrich sito ufficiale, said in 2008, after the earthquake occurred, according to school safety engineering requirements, education departments of each school buildings were detected. South of Road Primary School failed to meet due to the seismic capacity,http://211.86.128.2/gjjl/Review.asp?NewsID=595, was convicted of "dangerous", so the implementation of repair and reconstruction. "The project has to be built to the above three years, but the construction progress is slow, but now capped, playground renovation has commenced, we will accelerate the pace of construction,http://www.chrisadamsperfumes.com/index.php?item/create_form/1, but according to the current construction schedule, this year also can not build."<br> <br>As to why the school is not built for a long time,nike tn pas cher, infrastructure officers claimed that since the project cumbersome, from tender to approval to construction, every step is very troublesome, want parents to be patient,http://www.higoya.co.jp, to overcome temporary difficulties, but as to when they can He moved back,http://tucchy.sakura.ne.jp/c/epad/epad.cgi?mode=view&no=6086&res=1&page=30, which means they can not give a reply.<br><br>

    Posted 10 years ago #

RSS feed for this topic

Reply

You must log in to post.