DavidCadogan.ca Forums » DavidCadogan.ca

After a lapse of three months

(1 post)
  • Started 10 years ago by lpahn713151

  1. <br>Broadcasting Network Beijing December 18 (Reporter Han Jin), according to Voice of China "peak evening news" reported in Anhui Dongzhi County "Xiangyu Chemical Industry Park" is a national circular economy pilot units, gathered here over 40 chemical companies, with a total investment of nearly one billion yuan.<br> <br>Industrial waste water park by "Shuangxing Environmental Engineering Co., Ltd." handles. However, the company's sewage treatment plant built for three years, but still no acceptance. For three years, this company posing as a day with water treated wastewater, sewage treatment this "watered down", pollution hidden tricky practice why it can last three years?<br> <br>Anhui Provincial Environmental Protection Bureau in September this year, a law enforcement inspection found, Shuangxing Environmental Engineering Co., sewage treatment plant built three years later, has not yet completed environmental acceptance by the project, in the meantime, most of the water they actually handled from Tonghe nearby.<br> <br>Anhui Province Environmental Supervision Bureau inspectors Liu Jie: In accordance with the requirements of the EIA, 70 percent of industrial waste water,http://www.wuhemenhu.com/home.php?mod=space&uid=106907&do=blog&quickforward=1&id=247806, domestic wastewater is 30%. He collected domestic wastewater is not up, no way to adjust the conditioning tank, chemical water concentration is relatively high, he wanted to point a way to draw in from the river,http://socialfuzz.me/blogs/post/1301817, some adjustment.<br> <br>According to data provided by the Anhui Environmental Protection Bureau, according to the design requirements, this company's daily processing capacity of 5,000 tons of sewage daily processing capacity to reach 3,750 tons in order to meet the acceptance requirements,http://www.urbansocialentrepreneurs.org/web/index.php?option=com_community&view=profile&userid=289038, but the average industrial waste collection business is only about 1,500 tons per day,http://www.99teacher.com/home.php?mod=spacecp&ac=blog&blogid=, And to maintain the normal operation of sewage treatment plants and acceptance, it must have a certain amount of water. Since water is not enough, companies will use the river to join in. Liu Jie said that examination, they also found that the companies did not follow the requirements of the EIA pool acid hydrolysis, biochemical pool, sedimentation tanks stamped seal, no measures taken to prevent malodorous gases, sludge filter press has been no running water The total discharge port sampling results, COD reach 359 milligrams per liter, it is more than three times the normal standard, seriously overweight. Anhui Provincial Environmental Protection Bureau immediately asked for this for corrective actions,http://www.postyourasian.com, and to achieve at the end of November rectification requirements.<br> <br>Today rectification Environmental Engineering Co., Ltd. Shuangxing what? After a lapse of three months,scarpe hogan outlet, the reporter once again came to this enterprise, to view wastewater discharge port sampling data detected.<br> <br>When a reporter to view the past three months among enterprise wastewater discharge port sampling data detection found, September,moncler sito ufficiale, October, November,http://bbs.anjian.com/home.php?mod=spacecp&ac=blog&blogid=, three months of data actually identical corporate site operators did not dare to deny:<br> <br>Reporter: The last few data are exactly the same, this is wrong, not normal.<br> <br>Operator: systems are not we doing it the maximum is 76.2, this is wrong.<br> <br>In accordance with the normal logic, sewage sewage treatment plant should be completely collected from sewage pipe network, sewage treatment should also retain a portion of the sludge. But reporters at the scene,hogan rebel, in addition to the business park industrial wastewater, sewage treatment plants, this is still pouring from the three tubes pumping near Tonghe, Japanese take about 2800 tons of water; wastewater treatment plant without any sludge filter press machine simply can not come in handy. This company in charge Fengsheng Jiang also admitted the above facts:<br> <br>Reporter: Let the pump is taken out of the water come from?<br> <br>Fengsheng Jiang: from the river to come.<br> <br>Reporter: From the river to pass, right?<br> <br>Fengsheng Jiang: Yes,http://my.5754.cn/home.php?mod=spacecp&ac=blog&blogid=.<br> <br>Reporter: our sludge filter press there?<br> <br>Fengsheng Jiang: We have, but did not use.<br> <br>Reporter: In accordance with normal sewage treatment, or need water from the river and then into the pool inside,http://www.lsxzc.net/ShowPost.asp?ThreadID=198009, there is no procedure that ah?<br> <br>Fengsheng Jiang: I have this river, it's just a term, it is not necessarily a natural pure water, why you should be held this, I can not explain.<br> <br>According to the reporter, had made this sewage treatment plant did not meet the requirements of the EIA normal operation of enterprises,scrape hogan, and this is the business from early 2008 completed trial run so far, yet through project completion and acceptance of environmental protection is a fundamental reason, then, that a No acceptance of sewage treatment plants, but also why it has been run? Anhui Province Environmental Supervision Bureau inspectors Liu Jie explained:<br> <br>Liu Jie: he has done the EIA and his construction is mismatch, not on.<br> <br>Reporter: So it is up to now has been in operation?<br> <br>Liu Jie: It is related to the park so many chemical companies, waste not straight row, which is not good sewage treatment plant you stop it, stop a greater impact on the environment.<br> <br>Interview,orecchini tiffany, the reporter found that in Anhui Environmental Protection Bureau of the rectification requirements, which many companies are still not completed. In this regard, the park management committee official said, they will modify the EIA report as soon as possible and speed up the progress of the rectification, for the early completion of final acceptance.<br><br>

    Posted 10 years ago #

RSS feed for this topic

Reply

You must log in to post.