DavidCadogan.ca Forums » DavidCadogan.ca

the first time encountered such a problem. In any case

(1 post)
  • Started 10 years ago by ujdah01549uj

  1. Site pile lined reinforced a kick<br>Here once the building, adjacent villa exactly<br> <br>□ reporter Wang Han Ye Huo-sheng Chen Jianrong intern correspondent Dan<br> <br>District where great location, the owners removed the two luxury home, intending to rebuild bigger house.<br> <br>A district of East Lake High-Tech Development Zone, south of Third Ring Road, north of South Lake, excellent location. So far, the district last year put up a fence, and now the walls of a huge wide deep pit, and casually piled wood,http://www.provalterbi.ch/spip/spip.php?article15, rusty steel.<br> <br>On this site once stood a villa, in a building of high-end clubs. Removal of the original houses left unfinished projects, it is the owner of two houses. But no reason to remove their reconstruction after the relevant procedures, the owners and inspectors have been deadlocked for more than a year.<br> <br>The road leading to the lake district is also occupied<br> <br>"In the beginning, we did not think there is such a thing." Yesterday morning, Jiangxia District Urban Management Bureau,http://www.gourmetseed.com, said a law enforcement team, last spring, the patrol had seen here in construction, but the premises with a Universities only separated by a wall, was mistaken for a school related internal construction, it did not attract attention.<br> <br>But last August, the urban management department received a report said district residents, want someone secretly building. When law enforcement team to investigate again shocked: the construction area is not located within the universities, but in the district where the original two houses gone, instead it is a construction site.<br> <br>Law enforcement team to stop immediately. Construction of a responsible person to produce a number of relevant documents, said, "This is the boss gave us." Where a civil court mediation shows Wuhan-Kang Yuanlin Building Decoration Engineering Company Limited,http://carp.net, its legal representative Hu, on April 7, 2010, the Hongshan District People's Court mediation, reached a settlement agreement with the developers: Yin Kang contracted in 2003 and completed residential landscape greening projects, but some have been outstanding for projects, the final number in the cell A2 villa was priced 1.8 million yuan, arrived to Yin Kang.<br> <br>Another in November 2003 by the Jiangxia Housing Authority issued a "Wuhan City real estate ownership certificate" is displayed, this villa is Ganghunjiegou A2 number, a total of three, the construction area of 369.62 square meters. While the other buildings is a clubhouse, an area larger villas many relatively No. A2.<br> <br>There is a public road leading to the lake district, also into the wall ring within the construction area. The district one of the owners, said he lived here for many years, "Before, we always go that way to walk around the lake, and now this road have been accounted for, can not go."<br> <br>Put an end to illegal construction inspectors to prevent sticking to start<br> <br>"There is no planning permit and construction permit, you can not housing." Jiangxia District Urban Management Bureau, the owners prepare in this rebuilding a bigger house, on the grounds that the original room because of the foundation fall, has become dangerous, it must demolition and reconstruction.<br> <br>Owner does provide a "safe house testimonial." The identification of the book last year, filed April 20 issued by the Jiangxia housing safety appraisal, identified the object as a number A2 villa: The house was built in 2002 by the scene, the presence of its foundation uneven settlement, one to two more diagonal cracking at the wall, one to three multiple walls tilt, multiple cracking concrete beams deform severely deformed portion of the shaft pillar, roof cracking,moncler pas cher, serious leaks, the presence of one to three envelope cracking, loss of stability of the housing structure and capacity, can not ensure the safe use. The final identification result is that the house belongs to D level dangerous, they should stop using it.<br> <br>Inspectors believe that this identification of the book and not a substitute for the relevant building permit must be obtained before. In fact, all the files currently provides only villas A2, and the other buildings area bigger clubs are no relevant information.<br> <br>Jiangxia person in charge of law enforcement, ordered after his suspension, will be included in the height of the object of interest here, and strengthened inspections density, "absolutely not let it grow into illegal housing, as the removal of a greater degree of difficulty, but also the loss of the owners bigger. "<br> <br>Since then, due to urban "prevent sticking" here can only be maintained over messy situation, failed to "long high." March 15 this year, found that a group of workers entering the preparation and construction, urban management once again issued a "written decision shall be ordered to stop the construction."<br> <br>Subsequently, inspectors day and night marker, until recently, all workers leave, the site also re-locked.<br> <br>Owners never face to face with the mysterious inspectors<br> <br>Yesterday afternoon, the reporter on the scene saw a period of about two meters high,http://store.shopping.yahoo.co.jp/waiwai/snd253.html, 60 meters long wall, this film area with cells of other villas separated. There are two fan construction out of the blue iron gate on the fence, another fan imposing black iron gate is the original villa, all furrowed.<br> <br>Climb to the heights within the walls sweeping scenario: a rectangular area of about 500 m2 pit, about 4 meters deep, and the rest of the places are scattered stacked with all kinds of building materials. Reinforced been covered under the wind and rain rust, pit also grow a lot of weeds. Only two workers and a dog inside the guard, there is no sign of construction. "How to say it would be a major event it can be landlord has never played with us face to face." Inspectors say, to break the deadlock, to solve the problem, tried many times to get in touch with each other, but the owners never appear,http://www.poney.jp, Yao came to deliver just gave a testimonial.<br> <br>4 o'clock yesterday afternoon, according to the inspectors of the phone, communicating with reporters Yao through SMS, telephone, etc., but the other side "has been very busy." 8 o'clock evening, one man refused to disclose the names of telephone call to reporters,woolrich outlet, said the villa, there is a procedure already available to the inspectors. For this statement, Jiangxia District Urban Management Bureau official said that so far, did not see the planning permission and building permits.<br> <br>Urban management official said, for their behavior from the demolition of houses, the current bad interference. However,http://dietexperience.seesaa.net, if unable to produce the relevant permit unauthorized building, urban management department will be firmly removed, "even if it is at the site, nor exactly as you rebuild."<br> <br>Demolished and rebuilt his house, in the end whether compliance? Yesterday afternoon, reporters get in touch with the East Lake High-Tech Development Zone Planning Bureau. Bureau official said, the first time encountered such a problem. In any case, it must first obtain the appropriate license to start construction before the procedure, otherwise can be defined as illegal construction. Even with the original owners to rebuild the demolished house the same area, the height of the house,http://insyoku.livedoor.biz/archives/317467.html, it must first approval. The council will combine the existing regulations, conduct research on the new issues and seek a reasonable solution.<br> <br>Floral Strip illegally built much difficulty Control Manager<br> <br>Since the demolition of the villa rebuilt for acts within the district over the owners expressed dissatisfaction: "To be honest this is the people own house, he wants to dismantle who can not stay, but this takes up public resources." There are also owners said originally cell clean and orderly, but now so much more than a piece of "mess", the overall environmental damage, and hope the relevant departments to coordinate and solve problems quickly.<br> <br>Reporters learned from Jiangxia, many area once belonging Miaoshan zone Jiangxia, but has already hosted the East Lake High-Tech Development Zone; but there are still more than 130 units, the district illegally built Control Manager and law enforcement work, but also Jiangxia District Urban Management Bureau is responsible. At the same time, planning the identification work, but made from East Lake High-Tech Development Zone, the planning department to complete.<br> <br>Jiangxia District Urban Management Bureau said that, because of this, the work done, there are many difficulties: a difficult control, the original number of the law enforcement team will be very limited,piumini moncler, "how could every day to go outside the local administrative area Jiangxia Control Manager to inspect it ? "dilemma identified, after all, to do the identification of illegally built by the East Lake High-Tech Development Zone, spanned work is quite complex. The final is also difficult to investigate and deal with illegal construction in the investigation, in addition to urban management,tn reuqin pas cher, there should be involved in a number of departments and public security, but relates to two areas, joint law enforcement difficult to imagine.<br> <br>According to reports, in addition to the district, there are light blue county, Dragon Island, a number of villas, there are different degrees of illegal construction, which is the largest ride "sun room" was built garage. It is due to its geographical location in the "embarrassment", resulting in the air when the Control Manager,doudoune moncler soldes,http://hyougosoap.s102.xrea.com/cgi/j/j.cgi?mode=res&no=3362, is difficult to cure.<br> <br>Yesterday, Jiangxia chased bureau statement said: no matter how difficult, as long as the masses and verified illegally built, will be resolutely removed. But the two areas can expect coordinated early on illegally built unified centralized management, so that the work carried out smoothly.<br><br>

    Posted 10 years ago #

RSS feed for this topic

Reply

You must log in to post.