<br>Yanzhao Metropolitan Network reporter Cai Yun Lei<br> <br>December 28 at 15 am, the newspaper received a public rebellion, said Shijiazhuang Jianshe Road Fenghua Road intersection and a high-rise,capelli corti, two men crouched roof want to jump. They were multi-staff persuaded press time reporter, the two migrant workers came down yet.<br> <br>Two migrant workers pay talks climb tall<br> <br>15:30 reporters came to the construction of the street and see Fenghua Road intersection, east intersection about 100 meters there is a newly completed complex of high-rise buildings, the elevator machine room on the highest point of the roof, something all corners of a man squatting . In the process of reporters near the building, the man suddenly squatted Tung Tau floor sitting facing west corner, and droop under the right leg, the action is extremely dangerous. "Owes wages no hair,https://unitedstatesmilitia.com/forum/showthread.php?p=92418#post92418, climbed upstairs to go." Is a site workers with onlookers he told reporters that the building is a Huiqian Lou,ciocca di capelli, the construction side is a built in Jiangsu, a total of 11 floors,ou trouver des extension a clip, the two sit the location is 40 meters high. According to a migrant worker surnamed Xu introduction,http://fixpctechsupport.com/index.php?option=com_blog&view=comments&pid=36957&Itemid=30,capelli lunghi, they total more than 50 workers are owed a total of about 70 million salary, according to the agreement should have been issued around November 30,http://gr8c.org, but until now still no news.<br> <br>When reporters arrived at the scene,http://www.51yam.com/home.php?mod=spacecp&ac=blog&blogid=, police officers and fire two squadrons of the police station was built north of the fire brigade has arrived at the scene, police from time to time on the two men shouted, fire brigade stand a good box-type monitor, in real-time for two men monitor.<br> <br>15:40, police, firefighters and several other men went upstairs to persuade two men. Man head east in a few minutes turned into dialogue, but did not leave the danger area. Reporter downstairs could hear a man kept repeating:. "Give us the money, we will go down."<br> <br>No more than two hours to persuade downstairs<br> <br>Negotiations continued for about an hour, during which the two men has not left the roof. 16:20, a fire downstairs first soldier told reporters, police, firefighters, labor monitoring group of staff and the construction side, and I already told each other, the next person will be responsible for the construction came to discuss matters relating to wages,http://www.zhuzhou.com/home.php?mod=spacecp&ac=blog&blogid=, but They just said "do not give money not down," the negotiations stalemate.<br> <br>Nearly 17, the negotiators removed upstairs,extension cheveux naturel, a person claiming to represent workers in the construction side,http://www.chrisadamsperfumes.com/index.php?item/create_form/1, the construction in accordance with the contract party has to pay the entire construction team,http://firstmonday.org, as to why the workers did not get paid, he did not know. It is next to the other person, who is responsible for the construction of the project manager Wang.<br> <br>17 am,http://store.shopping.yahoo.co.jp/ebest-dvd/0000001061798.html, two migrant workers are still squatting on the roof, several other soldiers fire upstairs to persuade.<br> <br>As of press time reporter, the two migrant workers still down, but it did not appear throughout the construction team foreman.<br> <br> Share: welcome to comment I want to comment<br> Microblogging Recommended | hot microblogging today<br>
DavidCadogan.ca Forums » DavidCadogan.ca
a total of 11 floors
(1 post)-
Posted 10 years ago #
Reply
You must log in to post.