DavidCadogan.ca Forums » DavidCadogan.ca

Reporter Huang Guanghua

(1 post)
  • Started 10 years ago by afv4qofmo3

  1. Stranded about 100 freighter between Zhang and Zhang Bridge Dam Dam ship lock. Some film / video Huang Guanghua Liu Village bridge has collapsed, waterways were also stopped by the rope. 5 days and nights stranded ship,http://www.moviequote.net/moviequote.cgi, fishing boat owners "leisure."<br>Jining newspaper October 12 (Reporter Huang Guanghua) 12, was stopped due course, on the Jining Yutai County renaissance river more than 300 vessels stranded. Reporters at the scene investigation that vessel stranded near the old bridge Liu Walled Village (zhi) township, Liu Village section of the bridge deck had collapsed, the channel is also prohibited local village pulled the rope by passing ships.<br> <br>12, 10 am, reporters saw about 100 cargo ships filled with sand and stones in the fairway Zhang stop Dam (ni n) and Zhang Bridge Dam ship lock between scattered missing cargo occupies the entire river .<br> <br>Liu collapsed bridge in the Walled Dam ship lock Zhang Nan about 300 meters away. Reporters saw Liu Walled third bridge from east to west bridge opening has collapsed, and the channel portion of the bridge has been stopped by the rope.<br> <br>Liu Village on the south side of the bridge, the reporter also found that more than 50 vessels stranded,polo ralph lauren pas cher, these ships are lightship. Owners told reporters,http://store.shopping.yahoo.co.jp/ebest-dvd/0000000734834.html,karen millen dress,http://store.shopping.yahoo.co.jp/menscasual/n-tops-47-menscasual.html, on the downstream Zhang Dam ship lock, and there are many boats heard Liu Walled bridge blocked,http://www.postyourasian.com, had to stay in the middle, "a combined total of more than 300 ships."<br> <br>Trapped owner told reporters, from 7 to 12, 5 days and nights of the time, room and board all on board, "originally with water is not enough,louboutin femme,http://store.shopping.yahoo.co.jp/ebest-dvd/0000000900220.html, now there is no water to eat."<br> <br>One owner told reporters that the collapse of the bridge opening on the eastern side of the pier and did not hit, so the two channels on the eastern side constitute a threat, it can allow boats through. But for some unknown reason, Liu Zhaicun village on the fairway with a rope stopped.<br> <br>LIU Shang-Zhou Liu Zhaicun village director,http://www.imappage.net/bbs/bbs_test.cgi, told reporters two months ago, a runaway freighter will be a bridge pier Liu Walled hit shifted, accident freighter detained by police. After less than a month's time to hit the bridge, Liu Walled bridge collapsed in a night. LIU Shang and Zhou, Liu Village Bridge is a very important production bridge,babyliss curl pas cher, the bridge on the west side of the village there are 500 acres of land.<br> <br>LIU Shang Zhou said, pull the rope to prevent any vessel through, mainly to prevent secondary accidents. In ensuring the safety of the situation, Liu Zhaicun decided to release all the lightship first residence. As for cargo load, "we have to wait until the county departments to coordinate the release."<br> <br>On the 12th at 6 pm,hollister soldes, the reporter called one of the owner of that phone, Liu Village rope bridge has been torn down, but when the ship traveling to Zhang Dam ship lock, still can not pass,http://usr.cc/home.php?mod=spacecp&ac=blog&blogid=, "There is no air traffic control sector approval,http://boss.wonder-mix.com, who did not dare pull the lock to let boats pass. "<br><br>

    Posted 10 years ago #

RSS feed for this topic

Reply

You must log in to post.