Asphalt repaired more than 20 days to appear many cracks and collapsing a large area,hogan outlet online.<br>Chief reporter Zhang Zhili Ventura<br> <br>"Li Wu Village in Anyang County oct level between the missionaries' village to village there is a newly built asphalt,moncler pas cher,http://www.shop-sapporo.com/member/profile/cgi/diary.cgi?d=44499, it has repaired more than 20 days,http://store.shopping.yahoo.co.jp/ebest-dvd/0000000978434.html,louboutin soldes femme, there have been many cracks, and a large area collapsing." Yesterday morning, a readers phone call to the newspaper, said it was his understanding that the road repair has invested nearly one million,http://www.fu.is.saga-u.ac.jp, probably because the road rebuilt and again failed to be implemented.<br> <br>The new road is full of pit<br> <br>In the afternoon, reporters drove the whole paragraph viewed this way.<br> <br>Wu Li from village level started to go east, I saw a new paved asphalt surface cracks appear from time to time,http://store.shopping.yahoo.co.jp/gion/eos6dlk.html, in which a large crack about 10 cm, a thickness of about 5 cm asphalt, asphalt pieces under bare old concrete floor ( As shown). In the cracks, as long as you hand a pull,nike tn pas cher, it can broke off a chunk of asphalt.<br> <br>"Quality ye change of position difference?" A lot of the people talking about this in the past. Oct Village East Gate Village surnamed Huang Yan villagers told reporters that the road is in the (yellow) High (village) part of the line, from Anyang County oct Li Wu Village village level leading to the village of missionaries,http://store.shopping.yahoo.co.jp/red-one/mc-0033.html, full about 2.6 kilometers.<br> <br>"This road is to start construction in mid-September of this year,tn reuqin pas cher, has completed about 20 days." The villagers said that a few days after the road repaired, cracks began to appear, more than 10 days, more and more cracks. Villagers along the way understand why the new road has become "rubbish" project?<br> <br>New technology is to blame?<br> <br>Which is the owner of Anyang County Department of Transportation road rural road management. Yesterday afternoon, the director Zhu Fu now admit new road there is a problem. He said the road is one month before the start of the overhaul, a total investment of about 90 million. After the tender, they project contracted out to a Puyang City Road and Bridge Corporation,http://store.shopping.yahoo.co.jp/ebest-dvd/0000001133021.html, the entire project was completed by September 19.<br> <br>Just ten days ago, they found the road cracks and other conditions occur,http://www.leon-works.com, immediately to the scene of the asphalt concrete blocks were sampled by the inspection departments,http://www.rastafarispeaks.com/repatriation/index.cgi, asphalt concrete block found no problems. After analysis, the road was the result of this situation, it is possible and a new process using. He explained that the new process is the laying of asphalt concrete above ground, below the cold recycled base. Currently, the construction unit and experts are looking for the cause of the problem, in order to take the next steps.<br><br>
DavidCadogan.ca Forums » DavidCadogan.ca
there have been many cracks
(1 post)-
Posted 10 years ago #
Reply
You must log in to post.