Sticking to the rules, for the fast-growing sand and gravel industry, it will be eliminated if it is not changed. In terms of stone production today, if it is based on traditional fixed operations, a production line can only meet one size, but mobile sand on the market The stone production line is not only tried by many users, but also can be used everywhere and can be flexibly changed. Therefore, the fixed sand stone production line must be transformed to have a foothold in the market.
This is a Construction Waste Crusher with a tracked mobile crushing unit, which can directly complete the crushing operation of stone.
The mobile sand and gravel production line only needs 'three moves' to win the fixed production line
1. Flexible operation everywhere, making fixed production lines unattainable
The fixed production line not only has requirements on the construction site, but also needs to be installed. It has high requirements on infrastructure. The entire production line takes about one month from installation, test line to short production time, but it takes about two months for complicated terrain.